Submit an Article
Become a reviewer
Vol 159 Iss. 1
Pages:
47-49
Download volume:
RUS
Article

Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-25
Date accepted:
2003-07-08
Date published:
2004-12-21

Abstract

Determination of productive capacity of open-pit mines is the main problem in designing field development by the open-cut mining method. Direction of mining operations in open-pits and characteristics of working area development in horizontal direction greatly influence result consistency in establishing productive capacity basing on mining and engineering parameters, especially when economic and mathematical methods are used.

Область исследования:
(Archived) Development of mineral deposits
Funding:

None

Go to volume 159

Similar articles

Selection of optimal PI controller parameters
2004 M. K. Anikin
Assessment of the prospects for the use of domestic mining equipment at the Kirov mine of OAO Apatit
2004 A. V. Skvortsov
Evaluating the efficiency of the working volume of mixing devices
2004 S. V. Aleksandrov
Economic efficiency of company diversification
2004 A. M. Ivanov
Improvement of nepheline speck leaching technology based on the use of combined coagulants-flocculants of the carboaluminate-alklar type
2004 S. A. Vinogradov
Prevention of coal spontaneous ignition during mining of thick steep seams in Kuzbass
2004 E. V. Glushenkov, A. A. Sidorenko