Submit an Article
Become a reviewer
Vol 159 Iss. 1
Pages:
47-49
Download volume:
RUS
Article

Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-25
Date accepted:
2003-07-08
Date published:
2004-12-21

Abstract

Determination of productive capacity of open-pit mines is the main problem in designing field development by the open-cut mining method. Direction of mining operations in open-pits and characteristics of working area development in horizontal direction greatly influence result consistency in establishing productive capacity basing on mining and engineering parameters, especially when economic and mathematical methods are used.

Область исследования:
(Archived) Development of mineral deposits
Funding:

None

Go to volume 159

Similar articles

Methodological issues of improving the licensing of state subsoil use in the Russian Federation
2004 L. I. Iseeva, A. V. Zelenov
Computer jargon
2004 N. A. Aleksakhina
Ways to recycle and dispose of toxic industrial waste
2004 E. V. Eldina
Wallrock metasomatites of the Pavlovskoye polymetallic deposit (Novaya Zemlya Archipelago)
2004 V. O. Ilchenko, A. V. Antonov
Nanotribology: the effect of the relationship between the energy characteristics of the surface and the antifriction and insulating properties of adsorbed cationic surfactants
2004 A. G. Syrkov, S. E. Demyanov, I. V. Pleskunov, A. V. Fedorova
Overview of foreign forecasts for the development of Russia's oil and gas potential
2004 P. A. Khantaev