Submit an Article
Become a reviewer
Vol 159 Iss. 1
Pages:
47-49
Download volume:
RUS
Article

Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-25
Date accepted:
2003-07-08
Date published:
2004-12-21

Abstract

Determination of productive capacity of open-pit mines is the main problem in designing field development by the open-cut mining method. Direction of mining operations in open-pits and characteristics of working area development in horizontal direction greatly influence result consistency in establishing productive capacity basing on mining and engineering parameters, especially when economic and mathematical methods are used.

Область исследования:
(Archived) Development of mineral deposits
Go to volume 159

Similar articles

Retrospective analysis of cadastral valuation of land
2004 K. S. Shanina
Computer jargon
2004 N. A. Aleksakhina
Experimental and theoretical studies of transfer coefficients and heat transfer in the problems of filtration heat transfer
2004 N. N. Smirnova, Fam Tkhi Leu
Methods to reduce acidification of groundwater and surface water
2004 M. V. Parshina
Overview of foreign forecasts for the development of Russia's oil and gas potential
2004 P. A. Khantaev
Prevention of coal spontaneous ignition during mining of thick steep seams in Kuzbass
2004 E. V. Glushenkov, A. A. Sidorenko