Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed
Authors:
About authors
- Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Abstract
Determination of productive capacity of open-pit mines is the main problem in designing field development by the open-cut mining method. Direction of mining operations in open-pits and characteristics of working area development in horizontal direction greatly influence result consistency in establishing productive capacity basing on mining and engineering parameters, especially when economic and mathematical methods are used.
Область исследования:
(Archived) Development of mineral deposits
Similar articles
Selection of a site for land use with the help of geographic information systems
2004 T. G. Safaralieva
Comprehensive assessment of the environmental condition of territories in the impact area of mining and metallurgical enterprises on the basis of geographic information systems
2004 T. A. Petrova
Tunnel construction with the use of a microtunnel boring complex to build an advance protective screen of pipes
2004 M. R. Saitgareev
Organization of the monitoring system of the Peter and Paul Cathedral on the basis of engineering-geological and geo-environmental analysis of the conditions of its functioning
2004 A. V. Shidlovskaya