Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-25
Date accepted:
2003-07-08
Date published:
2004-01-01

Abstract

Determination of productive capacity of open-pit mines is the main problem in designing field development by the open-cut mining method. Direction of mining operations in open-pits and characteristics of working area development in horizontal direction greatly influence result consistency in establishing productive capacity basing on mining and engineering parameters, especially when economic and mathematical methods are used.

Go to volume 159

Similar articles

Influence of pulp temperature on zinc flotation performance
2004 A. M. Arustamyan
Reduction of energy consumption for pumping water by mine dewatering plants during parallel operation of pumps with frequency-controlled drive
2004 A. V. Lisitskii
Retrospective analysis of cadastral valuation of land
2004 K. S. Shanina
Mathematical modeling of acrylic-based flushing fluids parameters
2004 D. A. Dernov, M. V. Lukiyanov
Environmental security of the region: the concept and content
2004 D. N. Smirnova
Peculiarities of bauxite reserves calculation at one of the Vezha-Vorykvinsky deposit sites
2004 A. V. Kostyakhina