Submit an Article
Become a reviewer
Vol 159 No 1
Pages:
47-49
Download volume:
RUS

Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-25
Date accepted:
2003-07-08
Date published:
2004-01-01

Abstract

Determination of productive capacity of open-pit mines is the main problem in designing field development by the open-cut mining method. Direction of mining operations in open-pits and characteristics of working area development in horizontal direction greatly influence result consistency in establishing productive capacity basing on mining and engineering parameters, especially when economic and mathematical methods are used.

Go to volume 159

Similar articles

Compensation of higher harmonics in distribution networks with active filters
2004 O. B. Shonin, P. A. Rogov
Tunnel construction with the use of a microtunnel boring complex to build an advance protective screen of pipes
2004 M. R. Saitgareev
Some myths of contemporary Russian economic consciousness
2004 B. Ya. Pukshanskii, I. K. Zheltikova
Economic assessment of the process of storing rock - pit waste during the formation of technogenic deposits
2004 E. B. Gridina
Studying the spatial distribution patterns of ore mineralization of the Aganozero-Burakovskaya intrusion using quantitative interpretation in a three-dimensional environment
2004 I. V. Apukhtina
On the problems of professional-applied training of mining students
2004 G. V. Rudenko, S. N. Mirnonenko