Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-25
Date accepted:
2003-07-08
Date published:
2004-01-01

Abstract

Determination of productive capacity of open-pit mines is the main problem in designing field development by the open-cut mining method. Direction of mining operations in open-pits and characteristics of working area development in horizontal direction greatly influence result consistency in establishing productive capacity basing on mining and engineering parameters, especially when economic and mathematical methods are used.

Go to volume 159

Similar articles

Determination of optimal parameters of the limiting state zones of coal in the development of flat coal seams
2004 A. P. Gospodarikov, S. V. Vasilev, L. A. Bespalov
Some results of coal industry restructuring and prospects for the development of the oil shale industry
2004 E. A. Soloveva, M. V. Manylova
Improvement of deep borehole construction technology by drilling and blasting
2004 E. P. Reznikov
Economic efficiency of company diversification
2004 A. M. Ivanov
Modeling the activities of a mining company (OAO Olenegorsk Mining and Processing Division) based on a balanced scorecard system
2004 V. V. Vinogradova
Selection of a site for land use with the help of geographic information systems
2004 T. G. Safaralieva