Submit an Article
Become a reviewer
Vol 159 Iss. 1
Pages:
47-49
Download volume:
RUS
Article

Rationale for the development of the working area of the quarry with a variable direction of deepening at maximum speed

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2003-06-25
Date accepted:
2003-07-08
Date published:
2004-12-21

Abstract

Determination of productive capacity of open-pit mines is the main problem in designing field development by the open-cut mining method. Direction of mining operations in open-pits and characteristics of working area development in horizontal direction greatly influence result consistency in establishing productive capacity basing on mining and engineering parameters, especially when economic and mathematical methods are used.

Область исследования:
##submission.archive.categories## Development of mineral deposits
Go to volume 159

Similar articles

Environmental business and the prospects for its development in Russia
2004 V. V. Kosovtsev
Computer jargon
2004 N. A. Aleksakhina
Study of mixing processes in apparatuses with stirrers
2004 A. A. Markelov
Economic feasibility study of the "Kovykta - China - South Korea" natural gas export investment project
2004 D. A. Ilinskii
Retrospective analysis of cadastral valuation of land
2004 K. S. Shanina
On the problems of professional-applied training of mining students
2004 G. V. Rudenko, S. N. Mirnonenko