Submit an Article
Become a reviewer
Vol 167 Iss. 1
Pages:
67-69
Download volume:
RUS
Article

Stripping and preparation of new horizons at formation of a working zone of a quarry

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2005-06-10
Date accepted:
2005-07-27
Date published:
2006-03-30

Abstract

When forming the lower part of the working zone of the open pit - opening and preparation of new horizons - insufficient attention is paid to the shape of the excavated space of the lower horizon, which often cannot provide the most rational parameters of the blasted block, and therefore the maximum length of the mining front, which should compensate for the deficit arising from the mining front on the upper horizons. The present work provides the formation of the shape and parameters of the preparatory excavation, its position relative to the ore deposit and ensuring the maximum length of the mining front, taking into account the rational use of drilling and blasting.

Область исследования:
(Archived) Mining. Ecology
Funding:

None

Go to volume 167

Similar articles

Environmental assessment of Kostomuksha district of Karelia Republic on the basis of the results of ecological-geochemical research
2006 Ya. G. Panteleeva
Determination of influence of the dip angle value on the error of azimuth-dip determination
2006 N. V. Lagai
Relay protection and automation of substations of oilfield sites
2006 P. A. Rogov
Cleaning of near-surface sediments from oil pollution in conditions of swamp landscapes of Western Siberia
2006 M. M. Malyshkin
Analysis of granulometric composition of blasted rock mass
2006 D. V. Movchan
The subtleties of persuasion
2006 K. A. Burtsev