Stripping and preparation of new horizons at formation of a working zone of a quarry

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2005-06-10
Date accepted:
2005-07-27
Date published:
2006-01-01

Abstract

When forming the lower part of the working zone of the open pit - opening and preparation of new horizons - insufficient attention is paid to the shape of the excavated space of the lower horizon, which often cannot provide the most rational parameters of the blasted block, and therefore the maximum length of the mining front, which should compensate for the deficit arising from the mining front on the upper horizons. The present work provides the formation of the shape and parameters of the preparatory excavation, its position relative to the ore deposit and ensuring the maximum length of the mining front, taking into account the rational use of drilling and blasting.

Область исследования:
(Archived) Mining. Ecology
Go to volume 167

Similar articles

Methodology and practice of option accounting at justification of investment project Kovykta-China-South Korea
2006 D. A. Ilinskii
A geochemical and mineral associations of gold ore occurrences of Yanisyarvinsky area (South Karelia)
2006 O. A. Savicheva
Improvement of methodology of underground chambers and voids surveying
2006 N. M. Voluevich
Improvement of individual protection means for works in conditions of the North
2006 S. N. Poltorykhin
Development of bitumen fields of the Republic of Tatarstan by drilling special wells
2006 N. V. Faizullina
Computer modeling of radioisotope meter of density and phase composition of oil flow
2006 D. S. Levashov