Stripping and preparation of new horizons at formation of a working zone of a quarry

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2005-06-10
Date accepted:
2005-07-27
Date published:
2006-01-01

Abstract

When forming the lower part of the working zone of the open pit - opening and preparation of new horizons - insufficient attention is paid to the shape of the excavated space of the lower horizon, which often cannot provide the most rational parameters of the blasted block, and therefore the maximum length of the mining front, which should compensate for the deficit arising from the mining front on the upper horizons. The present work provides the formation of the shape and parameters of the preparatory excavation, its position relative to the ore deposit and ensuring the maximum length of the mining front, taking into account the rational use of drilling and blasting.

Область исследования:
(Archived) Mining. Ecology
Go to volume 167

Similar articles

Logocentrism of Russian mentality: to the question of word meaning in Russian culture
2006 A. G. Kostina
Kinetics of iron (II) sorption by ferromanganese nodules
2006 I. T. Zhadovskii
Comparative analysis of methods for determining qualitative characteristics of facing stone of the Karelian Isthmus
2006 A. Ya. Tutakova
Placement of productive forces in the region taking into account environmental factors
2006 L. N. Smirnova
Estimation of technogenic impact of tailing dump of Mikhailovsky MPP on adjacent agrolandscapes
2006 I. K. Ponurova
Experimental-industrial tests of lime hydrochemical treatment of nepheline sludge from alumina production
2006 A. V. Starshinov