Stripping and preparation of new horizons at formation of a working zone of a quarry

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2005-06-10
Date accepted:
2005-07-27
Date published:
2006-01-01

Abstract

When forming the lower part of the working zone of the open pit - opening and preparation of new horizons - insufficient attention is paid to the shape of the excavated space of the lower horizon, which often cannot provide the most rational parameters of the blasted block, and therefore the maximum length of the mining front, which should compensate for the deficit arising from the mining front on the upper horizons. The present work provides the formation of the shape and parameters of the preparatory excavation, its position relative to the ore deposit and ensuring the maximum length of the mining front, taking into account the rational use of drilling and blasting.

Go to volume 167

References

  1. Единая методика проектирования горно-добывающих предприятий черной металлургии с открытым способом разработки. Л.: Гипроруда, 1983.
  2. Нормы технологического проектирования. Л.: Гипроруда, 1986.
  3. Авдеев Ф.А. Нормативный справочник по буровзрывным работам. М.: Недра, 1986.

Similar articles

Economic efficiency of diversification of metallurgical production of mining and metallurgical company
2006 A. M. Ivanov
Horizontal drilling is one of the priority directions of Surgutneftegaz innovation development
2006 E. I. Sapozhnikova
Experimental-industrial tests of lime hydrochemical treatment of nepheline sludge from alumina production
2006 A. V. Starshinov
The subtleties of persuasion
2006 K. A. Burtsev
Strategic analysis of diversification of gas company
2006 N. P. Galaida
Improvement of individual protection means for works in conditions of the North
2006 S. N. Poltorykhin