Stripping and preparation of new horizons at formation of a working zone of a quarry

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2005-06-10
Date accepted:
2005-07-27
Date published:
2006-01-01

Abstract

When forming the lower part of the working zone of the open pit - opening and preparation of new horizons - insufficient attention is paid to the shape of the excavated space of the lower horizon, which often cannot provide the most rational parameters of the blasted block, and therefore the maximum length of the mining front, which should compensate for the deficit arising from the mining front on the upper horizons. The present work provides the formation of the shape and parameters of the preparatory excavation, its position relative to the ore deposit and ensuring the maximum length of the mining front, taking into account the rational use of drilling and blasting.

Область исследования:
(Archived) Mining. Ecology
Go to volume 167

Similar articles

Decomposition and technology of sparse matrixes in problems of research of complex systems
2006 A. E. Kochura, A. I. Mikheev, B. N. Kutsenko
Selection of power supply scheme of compressor station with gas-turbine drive by reliability criterion
2006 S. V. Baburin
Extreme control system of converter gas flow system
2006 M. K. Anikin
Electric methods for identification of diamonds and jewelry stones
2006 A. S. Mustafaev, N. S. Pschelko, I. I. Pavlikov, E. Yu. Zevelev
Symbolic character of communication of military servicemen
2006 E. I. Chirkova
Improvement of technology of construction of the middle tunnel of the metro station "Zvenigorodskaya"
2006 E. P. Reznikov