Stripping and preparation of new horizons at formation of a working zone of a quarry

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2005-06-10
Date accepted:
2005-07-27
Date published:
2006-03-30

Abstract

When forming the lower part of the working zone of the open pit - opening and preparation of new horizons - insufficient attention is paid to the shape of the excavated space of the lower horizon, which often cannot provide the most rational parameters of the blasted block, and therefore the maximum length of the mining front, which should compensate for the deficit arising from the mining front on the upper horizons. The present work provides the formation of the shape and parameters of the preparatory excavation, its position relative to the ore deposit and ensuring the maximum length of the mining front, taking into account the rational use of drilling and blasting.

Область исследования:
(Archived) Mining. Ecology
Funding:

None

Go to volume 167

Similar articles

Monitoring of soil and vegetation cover in the zone of impact of OAO Boksitogorsky Alumina
2006 D. S. Korelskii
Conducting magnetotelluric works in conditions of industrial interference on the example of works in the Republic of Adygea
2006 M. M. Pechenkin, T. V. Davydkina
Current and voltage curve correction systems
2006 Yu. A. Sychev
Advantages of drilling out cylindrical stone products at quarries and methods of their separation from the rock massif
2006 D. G. Egorov
Laws of distribution of concentration of solid particles during the flow of concentrated hydro-mixtures through pipelines
2006 I. A. Bostan, N. A. Ekimov
A geochemical and mineral associations of gold ore occurrences of Yanisyarvinsky area (South Karelia)
2006 O. A. Savicheva