Stripping and preparation of new horizons at formation of a working zone of a quarry
Authors:
About authors
- Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Abstract
When forming the lower part of the working zone of the open pit - opening and preparation of new horizons - insufficient attention is paid to the shape of the excavated space of the lower horizon, which often cannot provide the most rational parameters of the blasted block, and therefore the maximum length of the mining front, which should compensate for the deficit arising from the mining front on the upper horizons. The present work provides the formation of the shape and parameters of the preparatory excavation, its position relative to the ore deposit and ensuring the maximum length of the mining front, taking into account the rational use of drilling and blasting.
Область исследования:
(Archived) Mining. Ecology
Funding:
None
Similar articles
Monitoring of soil and vegetation cover in the zone of impact of OAO Boksitogorsky Alumina
2006 D. S. Korelskii
Development of flushing technology when drilling horizontal wells by horizontal directional drilling units
2006 S. K. Pavlova
Justification of resource-saving technological schemes of mining of powerful steep formations
2006 E. V. Glushchenkov