Stripping and preparation of new horizons at formation of a working zone of a quarry

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2005-06-10
Date accepted:
2005-07-27
Date published:
2006-01-01

Abstract

When forming the lower part of the working zone of the open pit - opening and preparation of new horizons - insufficient attention is paid to the shape of the excavated space of the lower horizon, which often cannot provide the most rational parameters of the blasted block, and therefore the maximum length of the mining front, which should compensate for the deficit arising from the mining front on the upper horizons. The present work provides the formation of the shape and parameters of the preparatory excavation, its position relative to the ore deposit and ensuring the maximum length of the mining front, taking into account the rational use of drilling and blasting.

Область исследования:
(Archived) Mining. Ecology
Go to volume 167

Similar articles

Influence of ascending order of mining on stressed state of ore massif
2006 D. Yu. Minaev
Regularities of change of spatial position of a drilling shell in a borehole
2006 M. V. Zubkov
Peculiarities of zircon mineralization manifestation in pegmatites of Mamsko-Chuyskaya muscovite province
2006 E. S. Kiseeva
A geochemical and mineral associations of gold ore occurrences of Yanisyarvinsky area (South Karelia)
2006 O. A. Savicheva
Control of energy quality parameters in networks with nonlinear load
2006 S. Yu. Tyagushev, V. V. Sobolev
Determination of influence of the dip angle value on the error of azimuth-dip determination
2006 N. V. Lagai