Research article
Mining. Ecology

Stripping and preparation of new horizons at formation of a working zone of a quarry

Authors:
I. A. Ishkulova
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2005-06-10
Date accepted:
2005-07-27
Date published:
2006-01-01

Abstract

When forming the lower part of the working zone of the open pit - opening and preparation of new horizons - insufficient attention is paid to the shape of the excavated space of the lower horizon, which often cannot provide the most rational parameters of the blasted block, and therefore the maximum length of the mining front, which should compensate for the deficit arising from the mining front on the upper horizons. The present work provides the formation of the shape and parameters of the preparatory excavation, its position relative to the ore deposit and ensuring the maximum length of the mining front, taking into account the rational use of drilling and blasting.

Go to volume 167

References

  1. Единая методика проектирования горно-добывающих предприятий черной металлургии с открытым способом разработки. Л.: Гипроруда, 1983.
  2. Нормы технологического проектирования. Л.: Гипроруда, 1986.
  3. Авдеев Ф.А. Нормативный справочник по буровзрывным работам. М.: Недра, 1986.

Similar articles

Regularities of change of spatial position of a drilling shell in a borehole
2006 M. V. Zubkov
Experimental research stand for studying downhole processes of ARPD deposition
2006 Kh. A. Sarsenbaev
Results of research of dust and gas cloud formation process at the quarry of OOO PG Phosphorit
2006 O. V. Tikhonova
Woman-manager in modern Russia
2006 B. Ya. Pukshanskii, E. A. Kanbekova
Ethics of catastrophes
2006 Yu. D. Larina
Grapho-analytical method of determination of parameters of rod fastening of excavations on shock-hazardous deposits
2006 T. F. Kasumov