Submit an Article
Become a reviewer
Vol 167 Iss. 1
Pages:
45-47
Download volume:
RUS
Article
Geology

Justification of application of new composite materials in plugging solutions for cementing the borehole borehole space in the interval of perforation works

Authors:
R. A. Usmanov
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2005-06-14
Date accepted:
2005-07-04
Date published:
2006-01-01

Abstract

The article considers topical problems of construction and operation of oil and gas wells; issues of cracks in the cement stone in the process of perforation of the casing string. Chemical and physical methods of influence on the plugging solution to improve the quality of the well casing are investigated and applied. The technique of application of chemical reagents, including cationic surfactants in composite plugging suspensions has been developed. Recommendations are given for perforating operations, at which the deleterious effect of thermomechanical loads on the well support is minimized.

Область исследования:
Geology
Go to volume 167

Similar articles

Improvement of individual protection means for works in conditions of the North
2006 S. N. Poltorykhin
Kinetics of iron (II) sorption by ferromanganese nodules
2006 I. T. Zhadovskii
Placement of productive forces in the region taking into account environmental factors
2006 L. N. Smirnova
Prospects of application of mining equipment of domestic production at Kirov mine of OAO Apatit
2006 A. V. Skvortsov
Monitoring of soil and vegetation cover in the zone of impact of OAO Boksitogorsky Alumina
2006 D. S. Korelskii
Safety of blasting operations with industrial explosives based on utilized powders
2006 S. Yu. Semenyak