Submit an Article
Become a reviewer
Vol 167 Iss. 1
Pages:
45-47
Download volume:
RUS
Article
Geology

Justification of application of new composite materials in plugging solutions for cementing the borehole borehole space in the interval of perforation works

Authors:
R. A. Usmanov
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2005-06-14
Date accepted:
2005-07-04
Date published:
2006-03-30

Abstract

The article considers topical problems of construction and operation of oil and gas wells; issues of cracks in the cement stone in the process of perforation of the casing string. Chemical and physical methods of influence on the plugging solution to improve the quality of the well casing are investigated and applied. The technique of application of chemical reagents, including cationic surfactants in composite plugging suspensions has been developed. Recommendations are given for perforating operations, at which the deleterious effect of thermomechanical loads on the well support is minimized.

Область исследования:
Geology
Funding:

None

Go to volume 167

Similar articles

Improvement of technology of construction of the middle tunnel of the metro station "Zvenigorodskaya"
2006 E. P. Reznikov
Determination of influence of the dip angle value on the error of azimuth-dip determination
2006 N. V. Lagai
Information-analytical system of control and formation of gas-transport flows of main gas pipelines
2006 N. Yu. Tropinova
Monitoring of soil and vegetation cover in the zone of impact of OAO Boksitogorsky Alumina
2006 D. S. Korelskii
Electric methods for identification of diamonds and jewelry stones
2006 A. S. Mustafaev, N. S. Pschelko, I. I. Pavlikov, E. Yu. Zevelev
Regularities of change of spatial position of a drilling shell in a borehole
2006 M. V. Zubkov