Justification of application of new composite materials in plugging solutions for cementing the borehole borehole space in the interval of perforation works
Authors:
About authors
- Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Abstract
The article considers topical problems of construction and operation of oil and gas wells; issues of cracks in the cement stone in the process of perforation of the casing string. Chemical and physical methods of influence on the plugging solution to improve the quality of the well casing are investigated and applied. The technique of application of chemical reagents, including cationic surfactants in composite plugging suspensions has been developed. Recommendations are given for perforating operations, at which the deleterious effect of thermomechanical loads on the well support is minimized.
Область исследования:
Geology
Similar articles
Justification of the methodology of determination of optimal normative payments and optimal strategies of the enterprise on environmental protection
2006 N. V. Gurova
Comparative analysis of methods for determining qualitative characteristics of facing stone of the Karelian Isthmus
2006 A. Ya. Tutakova
Determination of heat losses during steam injection into oil reservoir
2006 N. N. Smirnova, N. O. Iimu
Conducting magnetotelluric works in conditions of industrial interference on the example of works in the Republic of Adygea
2006 M. M. Pechenkin, T. V. Davydkina