Geology

Justification of application of new composite materials in plugging solutions for cementing the borehole borehole space in the interval of perforation works

Authors:
R. A. Usmanov
About authors
  • Postgraduate student G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2005-06-14
Date accepted:
2005-07-04
Date published:
2006-01-01

Abstract

The article considers topical problems of construction and operation of oil and gas wells; issues of cracks in the cement stone in the process of perforation of the casing string. Chemical and physical methods of influence on the plugging solution to improve the quality of the well casing are investigated and applied. The technique of application of chemical reagents, including cationic surfactants in composite plugging suspensions has been developed. Recommendations are given for perforating operations, at which the deleterious effect of thermomechanical loads on the well support is minimized.

Область исследования:
Geology
Go to volume 167

Similar articles

Decomposition and technology of sparse matrixes in problems of research of complex systems
2006 A. E. Kochura, A. I. Mikheev, B. N. Kutsenko
Stripping and preparation of new horizons at formation of a working zone of a quarry
2006 I. A. Ishkulova
Possibility of application of satellite radio-navigation systems in modern construction
2006 V. G. Tselovalnikov
Sorption treatment of mine water from fluorine and boron at the Yakovlevskoye site
2006 A. G. Stukkei
Relay protection and automation of substations of oilfield sites
2006 P. A. Rogov
Information-analytical system of control and formation of gas-transport flows of main gas pipelines
2006 N. Yu. Tropinova