Problems of utilization of the Hutton drilling platform
About authors
- 1 — Onega Research and Production Association
- 2 — Onega Research and Production Association
Abstract
The idea to use the upper structure of the worked off foreign oil platform «Hutton» in construction of the newly built platform «Prirazlomnaya» should significantly abridged the time for its starting oil production. But the life cycle of any offshore construction will inevitably lead to its dismantle utilization, and the project of destruction should be planned in advance. Russian industrial enterprises haven’t any experience of dismantling and dismembering such large metallic structures profitably. Elaboration of needed technologies should be connected with a series of problems; their listing is shown in the paper.
Область исследования:
(Archived) Problems of shelf development: geology and ocean engineering
Similar articles
Geological mapping of the Arctic shelf of Russia - scientific and information basis of subsoil use
2008 E. A. Gusev, V. M. Anokhin, A. Z. Burskiy, V. A. Burskiy, B. G. Burskiy, S. I. Shkarubo
Hydrocarbon monitoring of bottom sediments of Pechora Bay (assessment of consequences of Usinsk oil spill)
2008 A. V. Kursheva, I. V. Litvinenko
Electrical exploration by MTZ method in the complex of regional oil and gas prospecting works in the European part of Russia
2008 I. S. Feldman, B. A. Okulesskiy, A. K. Suleimanov, V. N. Nikolaev, V. A. Kuncherov, S. S. Chamo