Submit an Article
Become a reviewer
Vol 176
Pages:
111-113
Download volume:

Problems of utilization of the Hutton drilling platform

Authors:
A. A. Zhestkov1
R. A. Nizamutdinov2
About authors
  • 1 — Onega Research and Production Association
  • 2 — Onega Research and Production Association
Date submitted:
2007-09-24
Date accepted:
2007-11-25
Date published:
2008-03-01

Abstract

The idea to use the upper structure of the worked off foreign oil platform «Hutton» in construction of the newly built platform «Prirazlomnaya» should significantly abridged the time for its starting oil production. But the life cycle of any offshore construction will inevitably lead to its dismantle utilization, and the project of destruction should be planned in advance. Russian industrial enterprises haven’t any experience of dismantling and dismembering such large metallic structures profitably. Elaboration of needed technologies should be connected with a series of problems; their listing is shown in the paper.

Go to volume 176

Similar articles

Application of 2DMTZ for oil prospecting in the delta of the St. Clee River (south-eastern Ontario, Canada)
2008 A. I. Ingerov
Environmental geomorphology of the Arctic shelf of Eurasia
2008 A. G. Zinchenko
Experimental study of internal waves in the Arctic shelf zone
2008 O. D. Shishkina
About application of a complex of direct methods of search for coal-hydrocarbons in the process of oil and gas prospecting works of NAK Neftegas of Ukraine
2008 A. N. Koval, P. M. Chepil
Scientific and methodological problems of geological interpretation of the digital database of the materials of deep electrical exploration on the territory of the European part of Russia
2008 I. S. Feldman, Yu. M. Erinchek, A. S. Egorov
Spectrophotometric analysis of fine-grained fraction of red-colored strata
2008 A. G. Bogatyreva