Problems of utilization of the Hutton drilling platform

Authors:
A. A. Zhestkov1
R. A. Nizamutdinov2
About authors
  • 1 — Onega Research and Production Association
  • 2 — Onega Research and Production Association
Date submitted:
2007-09-24
Date accepted:
2007-11-25
Date published:
2008-10-06

Abstract

The idea to use the upper structure of the worked off foreign oil platform «Hutton» in construction of the newly built platform «Prirazlomnaya» should significantly abridged the time for its starting oil production. But the life cycle of any offshore construction will inevitably lead to its dismantle utilization, and the project of destruction should be planned in advance. Russian industrial enterprises haven’t any experience of dismantling and dismembering such large metallic structures profitably. Elaboration of needed technologies should be connected with a series of problems; their listing is shown in the paper.

Go to volume 176

Similar articles

Problems of water flooding of oil fields on the shelf of the Arctic seas
2008 V. I. Litvinenko
Problems of creation of underwater systems of control over sea pipelines condition
2008 I. N. Onishchenko, A. S. Portnoy
Detection of geologic heterogeneities by MTS method data
2008 I. A. Gubin
Methodological principles of landscape-geoecological studies of the shelf on the example of the Barents Sea
2008 I. A. Andreeva, A. G. Zinchenko, B. G. Vanshtein, O. A. Kiiko, V. I. Petrova
Engineering-geological peculiarities of design and construction of underground sewage collectors in St. Petersburg by microtunneling method
2008 V. V. Artemyev, A. T. Artemyev, I. V. Artemyev, L. P. Artemyev
Hydrogeological monitoring on the landslide slope site in Sochi
2008 Yu. A. Norvatov, I. B. Petrova, V. V. Nazima, I. V. Tugarov