Problems of utilization of the Hutton drilling platform
About authors
- 1 — Onega Research and Production Association
- 2 — Onega Research and Production Association
Abstract
The idea to use the upper structure of the worked off foreign oil platform «Hutton» in construction of the newly built platform «Prirazlomnaya» should significantly abridged the time for its starting oil production. But the life cycle of any offshore construction will inevitably lead to its dismantle utilization, and the project of destruction should be planned in advance. Russian industrial enterprises haven’t any experience of dismantling and dismembering such large metallic structures profitably. Elaboration of needed technologies should be connected with a series of problems; their listing is shown in the paper.
Область исследования:
(Archived) Problems of shelf development: geology and ocean engineering
Similar articles
Hydrocarbon monitoring of bottom sediments of Pechora Bay (assessment of consequences of Usinsk oil spill)
2008 A. V. Kursheva, I. V. Litvinenko
Carbonate sequences of the Middle Ordovician-Silurian of the Pechora-Barents Sea megabasin
2008 N. V. Taninskaya
Development of geoelectrochemical technologies and their complex use in hydrocarbon prospecting
2008 M. B. Shtokalenko, S. G. Alekseev, S. A. Veshev, N. A. Voroshilov, O. F. Putikov
Results of electrical exploration in search of pipe-type objects in the areas of Arkhangelsk region
2008 Yu. V. Korotkov