Problems of utilization of the Hutton drilling platform
About authors
- 1 — Onega Research and Production Association
- 2 — Onega Research and Production Association
Abstract
The idea to use the upper structure of the worked off foreign oil platform «Hutton» in construction of the newly built platform «Prirazlomnaya» should significantly abridged the time for its starting oil production. But the life cycle of any offshore construction will inevitably lead to its dismantle utilization, and the project of destruction should be planned in advance. Russian industrial enterprises haven’t any experience of dismantling and dismembering such large metallic structures profitably. Elaboration of needed technologies should be connected with a series of problems; their listing is shown in the paper.
Область исследования:
(Archived) Problems of shelf development: geology and ocean engineering
Funding:
None
Similar articles
Application of 2DMTZ for oil prospecting in the delta of the St. Clee River (south-eastern Ontario, Canada)
2008 A. I. Ingerov
Selection and substantiation of optimal order and time of drilling of water-reducing wells of drainage contour in the course of open mining of the M.V.Lomonosov deposit
2008 F. G. Atroshchenko, D. A. Drugov, R. A. Filin
Types of hydrogeological structures of hydrothermal areas of the North Atlantic
2008 S. M. Sudarikov