Model of calculation of material balance of firing process on clinker for Portland cement production in rotary kiln

Authors:
Yu. V. Sharikov1
P. V. Ivanov2
About authors
  • 1 — G.V. Plekhanov Saint Petersburg Mining Institute
  • 2 — G.V. Plekhanov Saint Petersburg Mining Institute
Date submitted:
2007-10-27
Date accepted:
2007-12-26
Date published:
2008-10-23

Abstract

The essence of process of roasting charge on clinker was considered. The model of a rotating furnace was constructed in software package ReactOp. Dependences of the basic components processed charge on length of the furnace of sintering and the general change of the basic mass streams were found.

Область исследования:
(Archived) Mathematical modeling of technological processes in metallurgy
Go to volume 177

Similar articles

Methods and approaches to electrolyzer control depending on working conditions and design
2008 M. A. Glushchenko
Analysis of integration of information systems in mining and processing industry
2008 S. A. Oreshkin, M. F. Kornilov, E. D. Kadyrov, N. V. Danilova
Microprocessor control systems of signaling, centralization, blocking of the mining enterprise at OJSC Mikhailovsky MMP
2008 V. N. Konyakhin, S. V. Khomutov, A. V. Aldokhin
Automation of maintenance and repair management processes on the basis of software package TRIM
2008 V. A. Matyushin
Character of constant component of phase voltage of ore-heat furnaces for phosphorus and calcium carbide production
2008 A. A. Pedro, V. V. Vasiliev
Automated control system of ore preparation process at the enrichment plant
2008 N. V. Zyryanova