Justification and selection of parameters of the device for destruction of oversized mines in underground conditions of De Beers mines

Authors:
M. S. Rodin
About authors
  • Student G.V. Plekhanov Saint Petersburg State Mining Institute
Date submitted:
2008-09-04
Date accepted:
2008-11-29
Date published:
2009-04-21

Abstract

The article is devoted to the necessity of expansion of non-blasting methods’ utilization for breaking the kimberlitic oversize in underground conditions of De Beers’ mines. The advantages of hydraulic hammers as executive device of mobile rock breaker are shown. The optimal ratio between weights of hammer piston and operating tool is chosen and substantiated.

Область исследования:
(Archived) Geotechnical engineering, powerengineering and automation
Funding:

None

Go to volume 182

Similar articles

Petrological and geochemical features of glassy rocks of Nachi-Kinskoye and Payalpan deposits (Kamchatka)
2009 T. S. Eremina
Possible way of diagnostics of cutters of roadheaders and shearers
2009 M. P. Talerov
Application of the direct variant of the boundary element method in solving geomechanical problems for Starobinskoye field conditions
2009 A. P. Gospodarikov, L. A. Bespalov
Research of self-milling process of diamond-containing ores
2009 N. V. Nikolaeva
Simulation modeling of the resonant electric drive of the reciprocating-rotating motion of the dynamically balanced drilling projectile on the load-carrying cable
2009 S. S. Staroded
Peculiarities of internal structure of feldspars in granites of Salma massif
2009 D. A. Petrov