Assessment of stress-strain state of temporary support during constructhion of station tunnels of the metro
Authors:
About authors
- Deputy Head of Board on Capital Construction The Saint-Petersburg Metro
Abstract
In-situ testing technique of temporary support is given. The values of stress and normal force in arch and sides of steel support are shown. Determination of vertical load magnitude is done. It was determined that vertical load on support decreases by 1,54 times, if lag of support installation from the face is16 m.
Область исследования:
(Archived) Drilling
Funding:
None
References
- Lebedev M.O. Mining-ecological monitoring by the example of the large loop tunnel SKGD / M.O.Lebedev, V.V.Basykin // The etro and Tunnels. 2006. No.6, pp.24-26.
Similar articles
Investigations of the mechanism of methane desorption in coal saturation with carbon dioxide
2009 A. T. Karmansky
Geoelectrical investigation of promising oil and gas bearing areas in the south part of Siberian plat-form
2009 N. N. Nevedrova, M. I. Epov, A. M. Sanchaa, S. M. Babushkin
Regularities of changes in strength of rocks under complicated stress state, different levels of humidity and pore pressure
2009 A. T. Karmansky