Article

Assessment of stress-strain state of temporary support during constructhion of station tunnels of the metro

Authors:
V. A. Maslak
About authors
  • Deputy Head of Board on Capital Construction The Saint-Petersburg Metro
Date submitted:
2008-10-21
Date accepted:
2008-12-12
Date published:
2009-12-11

Abstract

In-situ testing technique of temporary support is given. The values of stress and normal force in arch and sides of steel support are shown. Determination of vertical load magnitude is done. It was determined that vertical load on support decreases by 1,54 times, if lag of support installation from the face is16 m.

Область исследования:
(Archived) Drilling
Keywords:
Temporary support tunnel underground railway stress arch vault load
Go to volume 183

References

  1. Lebedev M.O. Mining-ecological monitoring by the example of the large loop tunnel SKGD / M.O.Lebedev, V.V.Basykin // The etro and Tunnels. 2006. No.6, pp.24-26.

Similar articles

Modern methods of hydrogeological investigations in terms of prospecting of titanium-magnetic iron deposit «South-East Gremiakha»
2009 Yu. A. Norvatov, I. B. Petrova, N. S. Petrov, I. V. Tugarov
Ore-forming hydrothermal solutions and gas hydrate formation in the ocean
2009 S. M. Sudarikov, S. S. Filatova
Georadar investigations of shallow depth оf geological section and engineering constructions
2009 V. V. Glazunov, N. N. Efimova
New source of noble corundum in Kenya
2009 L. V. Kulachkov, K. Kamwathi, V. L. Shterhun
Analytical continuation of geophysical fields by continued fractions method
2009 K. M. Ermokhin
Procedures and techniques for operation of the new automatic core orientator
2009 Yu. T. Morozov