Assessment of stress-strain state of temporary support during constructhion of station tunnels of the metro
Authors:
About authors
- Deputy Head of Board on Capital Construction The Saint-Petersburg Metro
Abstract
In-situ testing technique of temporary support is given. The values of stress and normal force in arch and sides of steel support are shown. Determination of vertical load magnitude is done. It was determined that vertical load on support decreases by 1,54 times, if lag of support installation from the face is16 m.
Область исследования:
(Archived) Drilling
Funding:
None
References
- Lebedev M.O. Mining-ecological monitoring by the example of the large loop tunnel SKGD / M.O.Lebedev, V.V.Basykin // The etro and Tunnels. 2006. No.6, pp.24-26.
Similar articles
Higher efficiency in drilling of oil and gas wells under complicated conditions
2009 N. I. Nikolaev, A. I. Ivanov
Modern methods of hydrogeological investigations in terms of prospecting of titanium-magnetic iron deposit «South-East Gremiakha»
2009 Yu. A. Norvatov, I. B. Petrova, N. S. Petrov, I. V. Tugarov
Engineering-geocryological problems оf the «Amur» federal highway Chita – Khabarovsk
2009 V. G. Kondratiev, S. V. Soboleva
Appearance of entropy principle in distribution оf the gold mass while formation of minable gold mineralization
2009 S. V. Sendek