Assessment of stress-strain state of temporary support during constructhion of station tunnels of the metro
Authors:
About authors
- Deputy Head of Board on Capital Construction The Saint-Petersburg Metro
Abstract
In-situ testing technique of temporary support is given. The values of stress and normal force in arch and sides of steel support are shown. Determination of vertical load magnitude is done. It was determined that vertical load on support decreases by 1,54 times, if lag of support installation from the face is16 m.
Область исследования:
(Archived) Drilling
Funding:
None
References
- Lebedev M.O. Mining-ecological monitoring by the example of the large loop tunnel SKGD / M.O.Lebedev, V.V.Basykin // The etro and Tunnels. 2006. No.6, pp.24-26.
Similar articles
History and prospects for the development of the karelian isthmus facing stone mineral base
2009 A. Y. Tutakova
MODEM 3D new software for the interpretation of IP-affected 3D tem data
2009 M. I. Ivanov, V. A. Kateshov, I. A. Kremer, M. I. Epov
Peculiarities of structure and comparative analysis of oil-and-gas basins in the Pacific segment of lithosphere
2009 V. B. Archegov
New data on infrared spectroscopy of diamonds from industrial deposits of Yakutia
2009 I. N. Bogush, S. I. Mityukhin, E. A. Vasiliev