Submit an Article
Become a reviewer
Vol 183
Pages:
300-302
Download volume:
RUS
Research article
Drilling

Assessment of stress-strain state of temporary support during constructhion of station tunnels of the metro

Authors:
V. A. Maslak
About authors
  • Deputy Head of Board on Capital Construction The Saint-Petersburg Metro
Date submitted:
2008-10-21
Date accepted:
2008-12-12
Date published:
2009-12-11

Abstract

In-situ testing technique of temporary support is given. The values of stress and normal force in arch and sides of steel support are shown. Determination of vertical load magnitude is done. It was determined that vertical load on support decreases by 1,54 times, if lag of support installation from the face is16 m.

Keywords:
Temporary support tunnel underground railway stress arch vault load
Go to volume 183

References

  1. Лебедев М.О. Горно-экологический мониторинг на примере большого петлевого тоннеля СКЖД / М.О.Лебедев, .В.Басыкин // Метро и тоннели. 2006. № 6. С. 24-26

Similar articles

Importance of taphonomic researches for solution of biotopes and ecological-facial ostracod communities of some Silurian and lower devonian ostracoda from the South Tien Shan
2009 E. D. Michailova
The modeling of formation processes of heightened polarizability zones above oil-and-gas deposits
2009 E. O. Kudryavtseva
Analytical continuation of geophysical fields by continued fractions method
2009 K. M. Ermokhin
History and prospects for the development of the karelian isthmus facing stone mineral base
2009 A. Y. Tutakova
Collecting properties of rocks in changes оf stress state type
2009 A. T. Karmansky
Georadar investigations of shallow depth оf geological section and engineering constructions
2009 V. V. Glazunov, N. N. Efimova