Assessment of stress-strain state of temporary support during constructhion of station tunnels of the metro
Authors:
About authors
- Deputy Head of Board on Capital Construction The Saint-Petersburg Metro
Abstract
In-situ testing technique of temporary support is given. The values of stress and normal force in arch and sides of steel support are shown. Determination of vertical load magnitude is done. It was determined that vertical load on support decreases by 1,54 times, if lag of support installation from the face is16 m.
Область исследования:
(Archived) Drilling
Funding:
None
References
- Lebedev M.O. Mining-ecological monitoring by the example of the large loop tunnel SKGD / M.O.Lebedev, V.V.Basykin // The etro and Tunnels. 2006. No.6, pp.24-26.
Similar articles
On correlation of element concentrations in spray нaloes of dispersion being fixed with different geoelectrochemical methods
2009 O. F. Putikov, E. G. Margovich
Nickel-containing iron oxides in the Buruktal deposit, South Urals
2009 S. O. Ryzkova, I. V. Talovina, V. G. Lazarenkov, N. I. Vorontsova, V. L. Ugolkov
Thermobaric granite crystallization conditions of the severniy massif (the Chukotka) in accordance with the feldspars study data
2009 V. I. Alekseev
Geoelectrical investigation of promising oil and gas bearing areas in the south part of Siberian plat-form
2009 N. N. Nevedrova, M. I. Epov, A. M. Sanchaa, S. M. Babushkin