Assessment of stress-strain state of temporary support during constructhion of station tunnels of the metro

Authors:
V. A. Maslak
About authors
  • Deputy Head of Board on Capital Construction The Saint-Petersburg Metro
Date submitted:
2008-10-21
Date accepted:
2008-12-12
Date published:
2009-12-11

Abstract

In-situ testing technique of temporary support is given. The values of stress and normal force in arch and sides of steel support are shown. Determination of vertical load magnitude is done. It was determined that vertical load on support decreases by 1,54 times, if lag of support installation from the face is16 m.

Область исследования:
(Archived) Drilling
Keywords:
Temporary support tunnel underground railway stress arch vault load
Funding:

None

Go to volume 183

References

  1. Lebedev M.O. Mining-ecological monitoring by the example of the large loop tunnel SKGD / M.O.Lebedev, V.V.Basykin // The etro and Tunnels. 2006. No.6, pp.24-26.

Similar articles

MODEM 3D new software for the interpretation of IP-affected 3D tem data
2009 M. I. Ivanov, V. A. Kateshov, I. A. Kremer, M. I. Epov
A new regional stratigraphical scheme of the upper palaeozoic of Taimir
2009 S. B. Shishlov
Nickel-containing iron oxides in the Buruktal deposit, South Urals
2009 S. O. Ryzkova, I. V. Talovina, V. G. Lazarenkov, N. I. Vorontsova, V. L. Ugolkov
On specific features of stratigraphy of the middle devonian deposits of the Leningrad region
2009 M. G. Tsinkoburova
Application of electrical prospecting in combination with seismic prospecting for the geological section prediction and search of hydrocarbon deposits
2009 V. A. Kuzin, A. A. Korukhova
Engineering-geocryological problems оf the «Amur» federal highway Chita – Khabarovsk
2009 V. G. Kondratiev, S. V. Soboleva