Assessment of stress-strain state of temporary support during constructhion of station tunnels of the metro
Authors:
About authors
- Deputy Head of Board on Capital Construction The Saint-Petersburg Metro
Abstract
In-situ testing technique of temporary support is given. The values of stress and normal force in arch and sides of steel support are shown. Determination of vertical load magnitude is done. It was determined that vertical load on support decreases by 1,54 times, if lag of support installation from the face is16 m.
Область исследования:
(Archived) Drilling
References
- Lebedev M.O. Mining-ecological monitoring by the example of the large loop tunnel SKGD / M.O.Lebedev, V.V.Basykin // The etro and Tunnels. 2006. No.6, pp.24-26.
Similar articles
Peculiarities of structure and comparative analysis of oil-and-gas basins in the Pacific segment of lithosphere
2009 V. B. Archegov
Regularities of changes in strength of rocks under complicated stress state, different levels of humidity and pore pressure
2009 A. T. Karmansky
Low frequency inductive airborne electromagnetic system em-4h
2009 A. K. Volkovitskiy, E. V. Karshakov, V. V. Popovich
Investigations of the mechanism of methane desorption in coal saturation with carbon dioxide
2009 A. T. Karmansky