Assessment of stress-strain state of temporary support during constructhion of station tunnels of the metro
Authors:
About authors
- Deputy Head of Board on Capital Construction The Saint-Petersburg Metro
Abstract
In-situ testing technique of temporary support is given. The values of stress and normal force in arch and sides of steel support are shown. Determination of vertical load magnitude is done. It was determined that vertical load on support decreases by 1,54 times, if lag of support installation from the face is16 m.
Область исследования:
(Archived) Drilling
References
- Lebedev M.O. Mining-ecological monitoring by the example of the large loop tunnel SKGD / M.O.Lebedev, V.V.Basykin // The etro and Tunnels. 2006. No.6, pp.24-26.
Similar articles
Prediction and prospecting types of reflection of buried kimberlite fields in terrigenous diamond-bearing rocks
2009 V. N. Ustinov
On specific features of stratigraphy of the middle devonian deposits of the Leningrad region
2009 M. G. Tsinkoburova
Modern methods of hydrogeological investigations in terms of prospecting of titanium-magnetic iron deposit «South-East Gremiakha»
2009 Yu. A. Norvatov, I. B. Petrova, N. S. Petrov, I. V. Tugarov
Prospects of nickel industry in the Urals in the light of ore field structure study in supergene nickel deposits
2009 N. I. Vorontsova, I. V. Talovina, V. G. Lazarenkov, S. O. Ryzhkova, O. P. Mezentseva