Submit an Article
Become a reviewer
Vol 183
Pages:
297-299
Download volume:
RUS
Research article
Drilling

Experience in providing the stability of tunnel face and roof during its drivage in proterozoic clays

Authors:
V. A. Maslak
About authors
  • Deputy Head of Board on Capital Construction The Saint-Petersburg Metro
Date submitted:
2008-10-29
Date accepted:
2008-12-11
Date published:
2009-12-11

Abstract

Methodology for assessment of state of advance support of face with fiberglass anchors and the working¢s roof – with tube anchors, is given. The results of in-situ experimental observations for efforts in anchors, displacements of excavation and growth of load on the advance supports in its roof are shown.

Keywords:
face ground anchor clay mine working stability stress deformation monitoring
Go to volume 183

References

  1. Маковский Л.В. Под защитой экрана из труб // Метрострой. 1980. № 4. С.23-24.

Similar articles

Geoelectrical investigation of promising oil and gas bearing areas in the south part of Siberian plat-form
2009 N. N. Nevedrova, M. I. Epov, A. M. Sanchaa, S. M. Babushkin
Application of georadiolocation in hydrology
2009 N. Y. Bobrov, S. S. Krylov, E. Yu. Kiselev, G. V. Priakhina, I. V. Fedorova
Electrical fields structure characteristics in tardanskii gold mineralization zone (the Republic of Tyva)
2009 A. N. Orekhov
Geological structure, characteristics of ores and genesis of ore occurrences in the Halvdanpiggen field (West Spitsbergen island)
2009 A. N. Sirotkin, V. V. Khailov, D. V. Nikitin
The modeling of formation processes of heightened polarizability zones above oil-and-gas deposits
2009 E. O. Kudryavtseva
Assessment of stress-strain state of temporary support during constructhion of station tunnels of the metro
2009 V. A. Maslak