Calculation of supports of parallel workings divided with yieldable pillars at anthracite seams

Authors:
S. G. Stradanchenko1
N. V. Titov2
A. A. Privalov3
Yu. V. Turuk4
About authors
  • 1 — Ph.D., Dr.Sci. The Novocherkassk Polytechnical Institute
  • 2 — Ph.D., Dr.Sci. Professor The Novocherkassk Polytechnical Institute
  • 3 — Ph.D., Dr.Sci. Professor The Novocherkassk Polytechnical Institute
  • 4 — Ph.D. senior lecturer The Novocherkassk Polytechnical Institute
Date submitted:
2009-07-19
Date accepted:
2009-09-11
Date published:
2010-04-22

Abstract

The article presents the methods for calculation of supports of parallel workings divided with yieldable pillars at anthracite seams. Consideration is given to the development of experimental data card for protection and maintenance of paired conveyor entries with using the steelpolymer anchor supports.

Keywords:
rigid and yielding pillars relief holes advance workings rock movements type of support preset yielding of pillar
Go to volume 185

References

  1. Титов Н.В. Пути повышения эффективности разработки тонких и средней мощности пологих антрацитовых пластов / Н.В.Титов, А.А.Привалов, Ю.В.Турук. Ростов н/Д: Изд-во журн. «Изв. вузов. Сев.-Кавк. регион», 2006. 196 с.
  2. Указания по рациональному расположению, охране и поддержанию горных выработок на угольных шахтах СССР / ВНИМИ. Л., 1977. 211 с.
  3. Указания по рациональному расположению, охране и поддержанию горных выработок на угольных шахтах СССР / ВНИМИ. Л., 1985. 222 с.

Similar articles

Active methods for control of geomechanical state of rock mass in coal deposit mining under complicated geological-and-mining conditions
2010 F. N. Voskoboev, Yu. A. Semenov, V. A. Zvezdkin
Conceptual principles of mining company’s balanced development in condition of necessity of innovation transformation
2010 A. A. Gurev
The use of data on stress-strain state of rock mass in solutions of mining-and-technical tasks on the example of the Tishin ore mine
2010 Yu. A. Kashnikov, S. G. Ashikhmin, D. V. Shustov, A. I. Ananin, A. E. Fandeev
Mathematical modeling of deformation processes and failure in fractured rock mass
2010
Influence of geomechanical processes in rock mass on the selection of parameters of technological schemes for flat seams mining at the Leninsk-Kuznetsk coal deposit
2010 E. P. Yutiaev
Legislation-legal and normative-technical support of the utilization of the earth's interior
2010 V. S. Zimich, M. P. Vasilchuk