Modeling of geomechanical processes and their geophysical control in coal strata mining
About authors
- 1 — Ph.D., Dr.Sci. chief research assistant Saint Petersburg State Mining Institute (Technical University)
- 2 — Ph.D. senior research assistant Saint Petersburg State Mining Institute (Technical University)
Abstract
The paper presents the results of combination of geomechanical and geophyisical monitoring. The stress state of the minable coal seams is calculated according to the program FAULT3D with account of mining operations plan, specific seam occurrence and geological disturbances. The analysis of seismic events in the geodynamically hazardous zone has been made.
Keywords:
geomechanical monitoring
geophysical monitoring
program
stress-strain state
hazardous zone
References
- Линьков А.М. Метод решения трехмерных задач о пластовых выработках и геологических нарушениях/ А.М.Линьков, В.В.Зубков, М.Хеиб // ФТПРПИ, 1997. № 4.
Similar articles
Geoecological monitoring as an information base of accident-free operation of gas mains under conditions of the Far North
2010 N. B. Pystina, A. V. Baranov
Preconditions for prediction of technogenic seismic activity by cycles of objects of the solar system
2010 B. G. Tarasov, A. G. Olovianny, L. V. Bugaenko