Modeling of geomechanical processes and their geophysical control in coal strata mining
About authors
- 1 — Ph.D., Dr.Sci. chief research assistant Saint Petersburg State Mining Institute (Technical University)
- 2 — Ph.D. senior research assistant Saint Petersburg State Mining Institute (Technical University)
Abstract
The paper presents the results of combination of geomechanical and geophyisical monitoring. The stress state of the minable coal seams is calculated according to the program FAULT3D with account of mining operations plan, specific seam occurrence and geological disturbances. The analysis of seismic events in the geodynamically hazardous zone has been made.
Область исследования:
(Archived) Problems in geodynamic safety in the exploration of solid deposits
Keywords:
geomechanical monitoring
geophysical monitoring
program
stress-strain state
hazardous zone
Funding:
None
References
- Linkov A.M., Zubkov V.V., Heib M. Method for solved 3D Problems at clearing excavations and faults // Physico-technical problems in mining Production. 1997. №4.
Similar articles
Research of deformation, strength and filtration characteristics of Nizhnechutinskoe oil field’s reservoirs in case of depression making in the process of oilwells exploitation
2010 A. V. Petukhov, A. A. Petukhov
Ecologycal and geodynamic safety and problems in industrial ecological monitoring at objects of an oil-gas complex
2010 A. I. Nikonov, O. V. Luk"yanov
Determination of coal pillar sizes in preparation of seams with paired mine workings
2010 N. V. Krotov, F. P. Ivchenko, D. V. Sidorov
Preconditions for prediction of technogenic seismic activity by cycles of objects of the solar system
2010 B. G. Tarasov, A. G. Olovianny, L. V. Bugaenko