Submit an Article
Become a reviewer
Vol 188
Pages:
15-17
Download volume:
RUS

Types and mechanisms of geodynamic hazard in mineral deposits mining and exploitation of buried and surface engineer constructions

Authors:
A. N. Shabarov
About authors
  • Ph.D., Dr.Sci. director of research center, prorector Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2009-10-12
Date accepted:
2009-12-29
Date published:
2010-09-22

Abstract

It is shown that major emergencies in mineral deposits mining and in exploitation of buried and surface engineer constructions are attributed to active faults. Classification of hazardous zones has been developed. The mechanisms of influence of geodynamic hazard in coal mines and pipeline exploitation were determined. The technology of reduction of geodynamic risk was suggested.

Keywords:
active fault mineral deposits geodynamic risk mines pipelines monitoring
Шабаров А.Н. Типы и механизмы геодинамической опасности при разработке месторождений полезных ископаемых и эксплуатации заглубленных и наземных инженерных сооружений // Записки Горного института. 2010. Т. 188 . С. 15-17.
Shabarov A.N. Types and mechanisms of geodynamic hazard in mineral deposits mining and exploitation of buried and surface engineer constructions // Journal of Mining Institute. 2010. Vol. 188 . p. 15-17.
Go to volume 188

Similar articles

Control system of rock pressure at the «Antey» deposit
2010 B. A. Prosekin, E. A. Ilin
Factors of geodynamic risk in exploration оf the Bovanenkovsk oil-gas condensate field аt the Jamal peninsular
2010 G. I. Griva, A. V. Brushkov, V. P. Melnikov, V. V. Samsonova
Modeling of geomechanical processes in mining the steeply pitching ore bodies of rockburst-hazardous deposits
2010 I. Yu. Rasskazov, M. I. Rasskazova, V. I. Miroshnikov, B. G. Saksin
Providing of safe conditions for mining of shaftbottom protective pillars in deep ore mines at Тalnakh
2010 V. A. Zvezdkin, A. G. Anokhin, R. B. Galaov
Support of geodynamic safety in mining of the Khibini deposits
2010 Yu. P. Shaposhnikov, A. Yu. Zvonar, S. A. Mozhaev, M. V. Akkuratov
Stress condition of prefabricated tunnel linning with initial release
2010 E. A. Karasev