Submit an Article
Become a reviewer
Vol 189
Pages:
348-350
Download volume:
RUS
Article

To the estimation of the rate of discounting for complex manufacture

Authors:
P. A. Zhigulevich
About authors
  • Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-07-14
Date accepted:
2010-09-14
Date published:
2011-03-21

Abstract

Various methods and approaches to definition of the rate of discounting are analysed. On  the basis of the given models calculation of the rate of discounting for the project of processing nepheline a concentrate is carried  out.

Область исследования:
(Archived) Economics and management
Go to volume 189

Similar articles

Revealing of the most significant factors of many-storeyed housing ground area cadastral cost estate of Northwest district small and average settlements
2011 O. Yu. Lepikhina
Substantiation of way unloading pillar in tectonically fractured massif
2011 A. G. Protosenya, D. Yu. Dorzhiev
Calculation methodology of physical parameters of the artificial pillar barrier
2011 M. N. Adreev
Geomechanical substantiation of optimal parameters of pillars in multientey scheme of coal seams development
2011 S. G. Kokoev
Research of opencast reloading point’s influence оn bench turnover rate
2011 G. A. Kholodnyakov, M. M. Yakubovskiy
Two genetic types of peristerites in iridescent plagioclases
2011 M. A. Ivanov, A. P. Simakov