Submit an Article
Become a reviewer
Vol 189
Pages:
226
Download volume:

Geomechanical substantiation of optimal parameters of pillars in multientey scheme of coal seams development

Authors:
S. G. Kokoev
About authors
  • Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-07-26
Date accepted:
2010-09-12
Date published:
2011-01-01

Abstract

Abstract: It is suggested the method for  the determination  of interentry pillars in  mining  the seams prone to rock bursts. The width of pillars is determined depending on  the  seam thickness and depth of mining  operations.

Go to volume 189

References

  1. Казанин О.И. Интенсивная отработка высокогазоносных угольных пластов на больших глубинах / О.И.Казанин, Г.Д.Задавин // МАНЭБ. СПб, 2007. 240 с.
  2. Коршунов Г.И. Многоштрековая подготовка угольных пластов / Г.И.Коршунов, А.К.Логинов, В.М.Шик. СПб.: Наука, 2007. 251 с.
  3. Кокоев С.Г. Оценка напряженного состояния системы межштрековых целиков при подготовке к выемке удароопасных пластов // Горный журнал. 2010. № 3 С 39-42.
  4. Расчетные методы в механике горных ударов и выбросов: Справочное пособие /И.М.Петухов, А.М.Линьков, В.С.Сидоров и др. М.: Недра, 1992. 256 с.

Similar articles

Ensuring of gas company’s business development stability through portfolio risk management
2011 N. P. Galaida
The model of productivity of forest land
2011 V. F. Kovyazin, E. A. Lagutenko
Simulation of swinging movement autoresonant electric drive with nonsymmetric excitation
2011 A. N. Fomenko
Prospects of hydrometallurgical processing of oxidized copper ores and sulfide copper concentrate, as part of new technology оf complex processing deposit «Erdenetiin Ovoo»
2011 M. Purevdash
Chemical transformation kinetics at sintering of the shludge in tubular rotary kilns in alumina production
2011 Yu. V. Sharikov, O. V. Titov
Implementation of green building standards for major territory development projects: SC «Olympstroy» experience
2011 A. O. Kharchenko, I. B. Sergeev