Submit an Article
Become a reviewer
Vol 189
Pages:
226-228
Download volume:
RUS

Geomechanical substantiation of optimal parameters of pillars in multientey scheme of coal seams development

Authors:
S. G. Kokoev
About authors
  • Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-07-26
Date accepted:
2010-09-12
Date published:
2011-01-01

Abstract

Abstract: It is suggested the method for  the determination  of interentry pillars in  mining  the seams prone to rock bursts. The width of pillars is determined depending on  the  seam thickness and depth of mining  operations.

Go to volume 189

References

  1. Казанин О.И. Интенсивная отработка высокогазоносных угольных пластов на больших глубинах / О.И.Казанин, Г.Д.Задавин // МАНЭБ. СПб, 2007. 240 с.
  2. Коршунов Г.И. Многоштрековая подготовка угольных пластов / Г.И.Коршунов, А.К.Логинов, В.М.Шик. СПб.: Наука, 2007. 251 с.
  3. Кокоев С.Г. Оценка напряженного состояния системы межштрековых целиков при подготовке к выемке удароопасных пластов // Горный журнал. 2010. № 3 С 39-42.
  4. Расчетные методы в механике горных ударов и выбросов: Справочное пособие /И.М.Петухов, А.М.Линьков, В.С.Сидоров и др. М.: Недра, 1992. 256 с.

Similar articles

The using of separating processes theory for prediction of granulometric composition after disintegration in cone inertial crusher
2011 A. V. Alikin
Forecasting by middle stratum ash content powerful compound structure deposits
2011 R. A. Takranov, U. Gundsambuu
Database development real estate rural municipalities
2011 V. G. Gorelikov, E. Yu. Ionova
Engineering-geological substantiation of reshaping wave-built solid masses with partial removal of hydraulic mine dump
2011 I. V. Kuznetsova, V. P. Zharikov
Modern technology concentration platinum metals from industrial waste by processing of sulphide copper-nickel ores
2011 V. N. Kovalev
Efficiency increasing of condenser batteries operation in mining enterprise`s electric circuits
2011 A. N. Skamin