Abstract

The factors influencing for open mountain works are established, bases of geologo-information model, typification of mountain-geological complexity of working out of coal deposits of advanced ways and means primary geologiche-skoj are offered the information. An effective method of a supply with information mine works is drawing up of the geologo-technological passport dredge-face. For mine works and their key process – drilling and explosive works the most significant geologists-cheskie the factors which are subject to studying and use for drawing up of passport drilling and explosive works are established. Skilled detonation confirms expediency of the offered improvements and use of laws of the geological factors, influencing crushing of breeds.

Область исследования:
(Archived) Mine survey
Funding:

None

Go to volume 190

Similar articles

Geomechanical analysis of underground pillar station with step by step excavation
2011 P. A. Demenkov, M. A. Karasev, D. A. Potemkin
Dynamic radiation control methods and instruments application peculiarities at underground points for nuclear materials storage placement, radioactive waste storages and underground nuclear thermo power plants
2011 V. G. Kondratev
Establishment of boundaries of hazardous zones in coal seam mining at mines of JSC «Suek-Kuzbass»
2011 N. V. Krotov, F. P. Ivchenko, A. P. Skakun, A. I. Paltsev
Metal pliable support developmentsin an ore file Yakovlevsky mine
2011 V. I. Ochkurov, Yu. N. Ogorodnikov, Yu. N. Antonov
Assessment of geodynamic and geomechanical conditions in the mining of ore bodies of near-ore bank reserves at the Koashva open-pit mine
2011 V. V. Zubkov, I. A. Zubkova, G. V. Leontev, A. G. Zileev
Designing support unilateral rectangular interfase of horizontal developments
2011 Yu. N. Ogorodnikov, V. I. Ochkurov, D. N. Petrov