Abstract
Now questions of the metrological control in маркшейдерских works have the uncertain status. The law in force about maintenance is uniform-stva measurements does not include in control sphere маркшейдерские work. Predlaga-etsja to return to practice of independent performance калибровочных works on the certificated ranges.
Область исследования:
(Archived) Mine survey
Funding:
None
Similar articles
Geomichanical justification of entries stability at development of nearboard reserves of Кoashva quarry with a roof fall of a disturbed pit wall
2011 Yu. N. Ogorodnikov, A. D. Kuranov
Dynamic radiation control methods and instruments application peculiarities at underground points for nuclear materials storage placement, radioactive waste storages and underground nuclear thermo power plants
2011 V. G. Kondratev
Foundation of Cholodninskoye deposit mining systems in conditions of ecological risks
2011 V. P. Zubov, O. V. Mikhailenko, A. A. Antonov, M. D. Morozov
Calculation of displacement and deformations of rocks tunnels arising at building taking into account vertical asymmetry in distribution of displacement
2011 E. M. Volokhov, N. S. Bakh