Submit an Article
Become a reviewer
Vol 190
Pages:
289
Download volume:
RUS
Article

Metrological maintenance mine surveying

Authors:
V. A. Golovanov1
E. M. Volokhov2
V. N. Gusev3
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
  • 3 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-18
Date accepted:
2010-10-11
Date published:
2011-04-05

Abstract

Now questions of the metrological control in маркшейдерских works have the uncertain status. The law in force about maintenance is uniform-stva measurements does not include in control sphere маркшейдерские work. Predlaga-etsja to return to practice of independent performance калибровочных works on the certificated ranges.

Область исследования:
(Archived) Mine survey
Funding:

None

Go to volume 190

Similar articles

Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport
2011 V. V. Ivanov
Aspects of coal strata mining at the mine of the elegest deposit (the republic of Tyva)
2011 Yu. V. Gromov, D. N. Demekhin
Establishment of boundaries of hazardous zones in coal seam mining at mines of JSC «Suek-Kuzbass»
2011 N. V. Krotov, F. P. Ivchenko, A. P. Skakun, A. I. Paltsev
Assessment of safety factor for analysis of stability of boards of open-cast mines
2011 V. V. Zubkov, I. A. Zubkova
A new technique for the determination of ultimate strength in extention of rocks
2011 V. A. Korshunov, Yu. M. Kartashov
Dynamics of rock pressure manifestation in mining the flat-lying coal seams with heavy roofs
2011 S. G. Baranov, D. S. Vlasenko, M. A. Loginov