Open cast technological system with in-pit fully mobile crushing reliability avaluation

Authors:
S. I. Fomin1
A. A. Faul2
A. I. Ponomarev3
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
  • 3 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-12
Date accepted:
2010-10-04
Date published:
2011-02-01

Abstract

The mining-transport equipment in technological schemes with application of the mobile crushing equipment represents difficult mining system with consecutive and parallel connection of separate technological elements. Reliability of system is defined on the basis of reliability of its components.

Go to volume 190

References

  1. Фомин С.И. Производительность карьеров и спрос на минеральное сырье. СПб: Изд-во «Тема», 1999. 169 с.

Similar articles

Phenomenon of dilatancy in fragmented rocks
2011 S. V. Tsirel
Geomechanical analysis of underground pillar station with step by step excavation
2011 P. A. Demenkov, M. A. Karasev, D. A. Potemkin
Foundation of Cholodninskoye deposit mining systems in conditions of ecological risks
2011 V. P. Zubov, O. V. Mikhailenko, A. A. Antonov, M. D. Morozov
Stress and strain state of strata before and after drainage
2011 D. N. Petrov
The determination of the volume stress-strain conditions of the soil massif in the face area of the tunnel in conditions of drafting with using of contledge of the face
2011 A. G. Protosenya, N. A. Belyakov
Geodinamical variability as a cause of natural disasters and technogenic catastrophes
2011 L. K. Gorshkov, Z. B. Dekusar