Automation of two stadial grinding for example mineral separation plant GMK «Pechenganickel»
About authors
- 1 — Saint Petersburg State Mining University
- 2 — Saint Petersburg State Mining University
- 3 — Saint Petersburg State Mining University
Abstract
The algorithm and system optimal control of two-cycle by stages for mineral separation plant GMK «Pechenganickel». Computer modeling, which allows to determine the optimal set of optimization systems that implement the developed algorithm. A functional diagram of automation, allows the implementation algorithm and a system of optimal control.
References
- Андреев Е.Е. Дробление, измельчение и подготовка сырья к обогащению: Учебник / Е.Е.Андреев, О.Н.Тихонов; СПГГИ. СПб, 2007. 440 с.
- JKSimMet User Manual and Supplementary Information Manual // JKTech. Indooroopilly, Qld., Australia. 1989. Version 4. Release 1.
Similar articles
Prediction of the technical status of pipeline based on analysis
2011 A. N. Lyubchik, E. I. Krapivskii, O. M. Bolshunova
Advantages of application of program complex LabView to creation of visual systems
2011 P. V. Ivanov, A. V. Boikov
Application of fuzzy-logic for modelling of process of fusion of the medno-nickel concentrate in furnace Vanjukova
2011 N. V. Danilov, E. D. Kadyrov
Some problems of automation of technological processes of the enterprises with using jf information security
2011 A. M. Blinov