Submit an Article
Become a reviewer
Vol 199
Pages:
325-328
Download volume:
RUS
Article

The calculation of accuracy of breaking the network using satellite navigation systems

Authors:
V. G. Potyukhlyaev
About authors
  • Ph.D. associate professor National Mineral Resources University (Mining University)
Date submitted:
2011-11-24
Date accepted:
2012-01-16
Date published:
2012-12-29

Abstract

Data is expounded about the modern production technology of marking works at building various objects, including those in mining industry with the use of satellite navigating systems and electron-optical devices. There are examples of accuracy calculation on constructing network of a building site proceeding from building admissions with the subsequent moving of starting points on wall signs.

Область исследования:
(Archived) Engineering geodesy and urban cadastre
Keywords:
geodetic marking works in building using of modern electron-optical and electronic devices accuracy calculation
Go to volume 199

References

  1. GOST 21779-82. Norms of accuracy in modular building. Technological admissions. Мoscow: Gosstandart, 1983.
  2. A management by calculation of accuracy of geodetic works in industrial building / Central administrative board of a geodesy and cartography at Ministerial council of the USSR. Мoscow: Nedra, 1979. 55 p.
  3. A management on creation and reconstruction of city geodetic networks with use of satellite systems GLONASS/GPS / CNIIGAiK. Мoscow, 2003. 62 p.
  4. SNiP 3.01.03-84. Geodetic works in building / Gos stroy of the USSR; CITP Gosstroy of the USSR. Мoscow , 1985. 28 p.

Similar articles

About the necessity of accounting of geodinamically active fractures zones in cadastral valuation оf settlement earths
2012 V. A. Kiselev, O. A. Tributs
Study of the influence of the form of security structures erected lava following on the mechanism underlying it rocks displacement
2012 V. N. Mokrienko, S. G. Negrei, D. N. Kurdyumov
Methodology of the complex estimation of influence of tectonic disturbances on stability of the rock mass at mining of rock-bump hazardous ore deposits difficult geologic structure
2012 D. V. Sidorov
Geomechanical justification of design parameters of room-and-pillar mining system for designing оf deep-lying horizons of SYBR
2012 D. V. Sidorov
Historical analysis of the system of estimation and expert’s examination of explored ore reserves in Russia
2012 A. V. Kozlov, V. A. Stepanov, I. G. Kiryakova, A. N. Evdokimov
Use of hydrogeomechanical monitoring during shielding tunnel for underground station оf Saint Petersburg subway «Admiralteiskaya»
2012 Yu. A. Norvatov, I. B. Petrova, M. V. Sergutin