Modelling stressedly-deformed condition of the soil massif including elements of the multipurpose facility with multystoried underground part
About authors
- 1 — National Mineral Resources University (Mining University)
- 2 — National Mineral Resources University (Mining University)
Abstract
In work the option of the multipurpose underground complex being part of the multystoried high-rise building is considered. The complex settles down in underground part of the building and carries out a base role, replacing with itself the usual plates-but-pile base. Predesigns by a method of final elements taking into account staging of construction of an underground complex and the land high-rise building are executed. Sizes and a picture of distribution of vertical displacements are received as a result of calculations.
References
- МДС 50-1. Проектирование и устройство оснований, фундаментов и подземных частей многофункциональных высотных зданий и комплексов / ФГУП НИЦ «Строительство». М., 2007.
- Руководство по комплексному освоению подземного пространства крупных городов. М., 2004.
Similar articles
Application of high-precision methods of laser scanning at creation of the detailed digital copies of objects
2013 V. V. Kulesh, G. I. Khudyakov
Algorithm to compute a flat rectangular coordinate, connectig of meridians and scale Gauss in 6-degree zone for geodetic coordinates
2013 V. N. Balandin, I. V. Menshikov, M. Ya. Bryn, Yu. G. Firsov, S. L. Shtern
Geomechanical analysis of surface settlement trough development due to construction of deep underground pillar station
2013 P. A. Demenkov
Automation of architecture and urban-planning authority as the basis of strategic planning
2013 P. P. Spirin, E. B. Bezhaeva, V. F. Kovyazin, E. D. Asetskaya