Modelling stressedly-deformed condition of the soil massif including elements of the multipurpose facility with multystoried underground part
About authors
- 1 — National Mineral Resources University (Mining University)
- 2 — National Mineral Resources University (Mining University)
Abstract
In work the option of the multipurpose underground complex being part of the multystoried high-rise building is considered. The complex settles down in underground part of the building and carries out a base role, replacing with itself the usual plates-but-pile base. Predesigns by a method of final elements taking into account staging of construction of an underground complex and the land high-rise building are executed. Sizes and a picture of distribution of vertical displacements are received as a result of calculations.
References
- МДС 50-1. Проектирование и устройство оснований, фундаментов и подземных частей многофункциональных высотных зданий и комплексов / ФГУП НИЦ «Строительство». М., 2007.
- Руководство по комплексному освоению подземного пространства крупных городов. М., 2004.
Similar articles
Automation of architecture and urban-planning authority as the basis of strategic planning
2013 P. P. Spirin, E. B. Bezhaeva, V. F. Kovyazin, E. D. Asetskaya
Modelling of process of liquidation of underground emptinesses in the conditions of technogenic activation
2013 A. A. Shubin
Assessment of the degree of disturbance of the undermined strata by technogenic water conducting fractures according to geomechanical monitoring in the excavations of Yakovlevski mine
2013 V. N. Gusev, D. A. Ilyukhin, A. E. Zhuravlev