Submit an Article
Become a reviewer
Vol 204
Pages:
223
Download volume:

Modelling stressedly-deformed condition of the soil massif including elements of the multipurpose facility with multystoried underground part

Authors:
P. A. Demenkov1
D. A. Potemkin2
About authors
  • 1 — National Mineral Resources University (Mining University)
  • 2 — National Mineral Resources University (Mining University)
Date submitted:
2012-11-26
Date accepted:
2013-01-05
Date published:
2013-05-01

Abstract

In work the option of the multipurpose underground complex being part of the multystoried high-rise building is considered. The complex settles down in underground part of  the building and carries out a base role, replacing with itself the usual plates-but-pile base. Predesigns by a method of final elements taking into account staging of construction of an underground complex and the land high-rise building are executed. Sizes and a picture of distribution   of vertical displacements are received as a result of calculations.

Go to volume 204

References

  1. МДС 50-1. Проектирование и устройство оснований, фундаментов и подземных частей многофункциональных высотных зданий и комплексов / ФГУП НИЦ «Строительство». М., 2007.
  2. Руководство по комплексному освоению подземного пространства крупных городов. М., 2004.

Similar articles

Rationale for the accuracy and parameters of cadastral surveying of land urbanized territories
2013 M. Ya. Bryn, P. A. Veselkin, V. N. Ivanov, A. V. Astapovich, Yu. V. Shcherbak
The criteria for land cover classification systems of Saint Petersburg protected areas
2013 A. A. Bogolyubova
Assessment of stress-strain conditions around single development with nonlinear rock-mass deformation
2013 A. G. Protosenya, V. I. Semenov
Influence percentage value common land on a property on market value of land gardening noncommercial organizations Leningrad’s region
2013 P. M. Demidova, V. G. Gorelikov
Lev Kelly: the 100th anniversary
2013 S. I. Pandul
Application of automated software system «PRESS 3D URAL» for predicting bump hazard zones parameters and discharge borehole well in advance of the ore deposit and pillars in difficult geomechanical conditions
2013 D. V. Sidorov