Geomechanical analysis of surface settlement trough development due to construction of deep underground pillar station
Authors:
About authors
- National Mineral Resources University (Mining University)
Abstract
Geomechanical analysis of surface subsidence development due to construction of deep underground station is presented. The station is a typical pylon structure, which is usually used during construction of the latest subway station in Saint Petersburg. Numerical modeling of step-by-step underground station construction is conducted. The results of the numerical analysis allow to predict the magnitude of surface settlement and understand the wide of settlement trough.
Similar articles
Characteristics of the strain-stress distribution of the quarry face with different curve
2013 M. G. Mustafin, A. V. Panchenko
Limitations management of land resources is based on information support for state real estate cadastre
2013 V. A. Kiselev, A. G. Shabaev
Use of affinne coordinate conversion at the local geodetic surveys with applying of GPS-receivers
2013 G. I. Khudyakov, G. V. Makarov