Submit an Article
Become a reviewer
Vol 206
Pages:
199
Download volume:

The assessment of the strategic project on increase of capacity of Yakovlevsky mine JSC «Metall-Group»

Authors:
T. V. Ponomarenko1
O. I. Tsarakov2
I. A. Akinina3
T. A. Pikalova4
About authors
  • 1 — National Mineral Resources University (Mining University)
  • 2 — National Mineral Resources University (Mining University)
  • 3 — National Mineral Resources University (Mining University)
  • 4 — National Mineral Resources University (Mining University)
Date submitted:
2013-01-28
Date accepted:
2013-03-09
Date published:
2013-07-01

Abstract

The characteristic of the unique iron ore enterprise is given. The assessment of capital expenses for building of land and underground objects of Yakovlevsky mine is made. The assessment of the current expenses for realization of the project is made. The economic indicators of efficiency of the project on increase of capacity of Yakovlevsky mine JSC «Metall-group» to 4,5 million tons per year are calculated. Planned technical and economic indicators are given. The assessment of financing source of the project is made.

Go to volume 206

References

  1. Анализ динамики мировых и российских цен на мелкодробленую руду с содержанием железа 63 %. Прогноз до 2018 г. // Аналитический обзор. ОАО «Институт исследования товародвижения и конъюнктуры оптового рынка». М., 2010.
  2. Баранов А.О. Расчет параметров технологических процессов подземной добычи руд. М., 1985.
  3. Коссов В.В. Методические рекомендации по оценке эффективности инвестиционных проектов / В.В.Коссов, В.Н.Лившиц, А.Г.Шахназаров. М., 2000.
  4. Нормы технологического проектирования горнодобывающих предприятий черной металлургии с подземным способом разработки. Л., 1970.
  5. Пономаренко Т.В. Ключевые показатели эффективности сбалансированной системы показателей в стратегическом управлении горными компаниями / Т.В.Пономаренко, И.А.Акинина // Записки Горного института. Т.201. 2012.

Similar articles

Substantiation of the possibility of involvement in processing of the iron-containing tails with the subsequent clotting of the obtained concentrates
2013 K. R. Argimbaev, A. V. Kornev, G. A. Kholodnyakov
Freshman of chemical and metallurgical department: how he got into mining university and what he wants (sociological research among first-year students)
2013 S. I. Sorokin, F. A. Vasilev, D. A. Kremcheeva
Mineralogical and geochemical characteristic of zwitters from Severny massif (Chukotka)
2013 A. V. Kurguzova, V. I. Alekseev
Use of electric fields for the control of metal-dielectric structures
2013 N. S. Pshchelko, A. S. Poll, D. O. Repetukh
The improvement of a technique of an automatic set of binding points in software «Geomatika-Fotoskhem 0.0.1»
2013 Yu. N. Kornilov, O. V. Zvereva, P. A. Artemev
Engineering-geological substantiation of safety building and operation constructions of different function within the lowland Predglintovaya (the Western part of the Leningrad region)
2013 R. E. Dashko, A. A. Korobko