Submit an Article
Become a reviewer
Vol 206
Pages:
93
Download volume:

Development wells in complicated conditions

Authors:
K. S. Kupavykh
About authors
  • National Mineral Resources University (Mining University)
Date submitted:
2013-01-08
Date accepted:
2013-03-14
Date published:
2013-07-01

Abstract

Opening of a layer and a calling of inflow of oil is the most important stage of construction of wells. We offer a new method of development of wells in the complicated conditions, which is based on the cyclic hydrodynamic impact on the layer. The developed technique is the most favorable to spent time and money.

Go to volume 206

References

  1. Гадиев С.М. Использование вибрации в добыче нефти. М., 1977. 150 с.
  2. Нифонтов Ю.А. Ремонт нефтяных скважин / Ю.А.Нифонтов, И.И.Клещенко. М., 2005. 162 с.
  3. Шипулин А.В. Использование инерции массы скважинной жидкости при воздействии на пласт // Нефть. Газ. Новации. 2009. № 2. С.34-35.

Similar articles

Radiation safety of labours (radiation monitoring) in building and underground structure operation
2013 G. I. Korshunov, N. A. Mironenkova, R. V. Potapov
Disposal of dehydrated sediments of water objects of the mining regions
2013 V. A. Petrova, M. A. Pashkevich
Cylindrical probe in anisotropic plasma: how can we achieve reliable results?
2013 A. S. Mustafaev, A. Yu. Grabovskii
Financing of sea regional exploration: a comparative analysis of russian and canadian experiance
2013 S. V. Lysak
Mineralogical and geochemical characteristic of zwitters from Severny massif (Chukotka)
2013 A. V. Kurguzova, V. I. Alekseev
Regarding the question about structure and content of the associative-verbal field «rest»
2013 E. A. Kurlova