Submit an Article
Become a reviewer
Vol 206
Pages:
93
Download volume:

Development wells in complicated conditions

Authors:
K. S. Kupavykh
About authors
  • National Mineral Resources University (Mining University)
Date submitted:
2013-01-08
Date accepted:
2013-03-14
Date published:
2013-07-01

Abstract

Opening of a layer and a calling of inflow of oil is the most important stage of construction of wells. We offer a new method of development of wells in the complicated conditions, which is based on the cyclic hydrodynamic impact on the layer. The developed technique is the most favorable to spent time and money.

Go to volume 206

References

  1. Гадиев С.М. Использование вибрации в добыче нефти. М., 1977. 150 с.
  2. Нифонтов Ю.А. Ремонт нефтяных скважин / Ю.А.Нифонтов, И.И.Клещенко. М., 2005. 162 с.
  3. Шипулин А.В. Использование инерции массы скважинной жидкости при воздействии на пласт // Нефть. Газ. Новации. 2009. № 2. С.34-35.

Similar articles

The use of photogrammetic method for object deformation detection with «Photomod» digital photogrammetic station
2013 Yu. N. Kornilov, P. A. Artemev, O. V. Zvereva
Substantiation of the possibility of involvement in processing of the iron-containing tails with the subsequent clotting of the obtained concentrates
2013 K. R. Argimbaev, A. V. Kornev, G. A. Kholodnyakov
Analysis of the landscape and geochemical situation in the ANOF-2 of the JSC «Apatite» tailing dump placement area
2013 M. A. Pashkevich, A. V. Strizhenok
Hydrocarbon exploration costs accounting (international practices)
2013 D. A. Yakupova, T. A. Tarabarinova
Roasting of difficult for concentration copper-molybdenum ore
2013 F. A. Vasilev, G. I. Dolivo-Dobrovolskaya, S. N. Saltykova
Structure-texture specialties gold-palladium ores of deposit Chudnoye (Polar Urals)
2013 D. P. Kosyanov