Parameters of removing the overburden for deposits complex structure of carbonate rocks
Authors:
About authors
- Ph.D. Associate professor National Mineral Resources University (Mining University)
Abstract
The main features of the development of Open-complex structure of carbonate rocks. The dependence for the determination of dozing on the domestic heap career, moving overburden on bestransportnoy scheme in goaf. Found that the optimum length of excavator block executed by one parking dragline at quarries carbonate rocks is achieved with the minimum total cost of doing the work of overburden and waste associated with the removal of the overburden.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
Funding:
None
References
- Ivanov V.V. Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport // Proceedings of the Mining Institute. 2011. Vol.190. P.46-50.
- Arsentiev A.I. The development of mining in the career spaceм / Saint Petersburg Mining Institute. Saint Petersburg, 1994. 104 p.
Similar articles
About the long-range programme for industrial and ecological safety in coal branch of industry
2014 V. V. Smirnyakova
Influence of disjunctive dislocations on parameters of secure zones on flat-lying adjacent coal seams
2014 V. P. Zubov, E. R. Kovalskii, A. V. Nikiforov
Approach to the conduct of monitoring studies in the area of the mineral and raw complex objects using remote sensing
2014 T. A. Petrova