Submit an Article
Become a reviewer
Vol 236
Pages:
172-179
Download volume:
RUS ENG
Article

Determining the stability of the borehole walls at drilling intervals of loosely coupled rocks considering zenith angle

Authors:
P. A. Blinov
About authors
  • Ph.D. Associate professor Saint-Petersburg Mining University
Date submitted:
2018-11-09
Date accepted:
2019-01-22
Date published:
2019-04-23

Abstract

During development of drilling projects, a whole array of data is needed considering the properties of rocks and the conditions of their bedding. Accounting for geomechanical processes occurring in the near-wellbore zone allows avoiding many complications associated with the violation of the wellbore walls stability at all stages of its construction and operation. Technological and technical factors such as vibration and rotation of the drilling string, formation of launders during the descent and ascent of the assembly, pressure pulsation during the start and stop of pumps, hydrostatic and hydrodynamic pressure of the drilling fluid, its composition and properties, have a great influence on the stress-strain state of the medium opened by the well. The washing fluid circulating in the well should provide backpressure to the reservoir, not interact with the rocks chemically, colmatage channels in porous and fractured rocks, preventing penetration of the mud into the medium, by creating an impermeable barrier at drilling clay seams that are prone to swelling, cracking, etc. The article discusses the method for determining the stability of the directed well walls, taking into account the penetration of drilling mud into the pores and fractures of rocks. The technique will allow adjusting the zenith angle of the well during the workout of an unstable interval at the design stage, or selecting a drilling fluid composition to ensure fail-safe drilling.

Область исследования:
Oil and gas
Keywords:
drilling drillingmud strain condition of the rocks stability of the wellbore drilling mud filtrate
10.31897/pmi.2019.2.172
Go to volume 236

Similar articles

Estimation of critical depth of deposits by rock bump hazard condition
2019 V. N. Tyupin
Structural model and tectonic evolution of the fault system in the Southern part of the Khur area, Central Iran
2019 A. Sohrabi, A. Nadimi, I. V. Talovina, H. Safaei
Produc-tion of Silver Ruble and participation of the Saint-Petersburg Mining university in the development of monetary industry of Russia
2019 V. Yu. Bazhin, N. M. Telyakov, T. A. Aleksandrova, D. V. Gorlenkov
Effect of chalk thermal treatment mode on its strength
2019 V. A. Lipin, D. A. Trufanov
Low-density cement compositions for well cementing under abnormally low reservoir pressure conditions
2019 N. I. Nikolaev, E. L. Leusheva
Prospects of geomechanics development in the context of new technological paradigm
2019 V. L. Trushko, A. G. Protosenya