Submit an Article
Become a reviewer
Vol 37 Iss. 1
Pages:
150-159
Download volume:
RUS
Article

Necessary and sufficient accuracy of the main underground polygonometric networks

Authors:
A. A. Gurich
Date submitted:
1957-07-05
Date accepted:
1957-09-06
Date published:
1958-04-16

Abstract

Underground polygonometer traverses traverses are laid in order to create a system of points with known coordinates in mine workings and to solve mining engineering tasks. Since such traverses are the basis for solving most of the surveying tasks, their quality and timeliness depends on the success of the surveying service of mining operations as a whole.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 37

Similar articles

Calculation of error in point determination in systems of leveling and polygonometric traverses
1958 A. N. Belolikov
Adjustment of continuous networks with measured side lengths jointly by the method of conditionaland indirect observations
1958 V. G. Zdanovich
Plumb line deviations in mountainous area
1958 A. A. Krzhizhanovskaya
Production tolerances determining the accuracy of mine surveying at coal mines
1958 A. A. Gurich
Ultrasound and ways of its application in surveying
1958 G. A. Krotov
Tensor representation of vectorial errors
1958 S. A. Korobkov