Determination of forces in a mine hoisting rope for the point of its overrun on the drum and the point of suspension of the load
Authors:
Abstract
Forces at the point of the rope running over the drum. To consider the scheme of lifting the load, we introduce the notations: ...
Область исследования:
(Archived) Manufacturing machinery and equipment
Similar articles
Review of theoretical studies on determination of dynamic forces in mine hoisting ropes
1964 P. A. Zhuravlev, A. F. Zakharevich
On the calculation of a cylindrical shell under a linear load distributed along a part of the shell
1964 L. S. Burshtein