Submit an Article
Become a reviewer
Vol 44 Iss. 3
Pages:
21-27
Download volume:
RUS
Article

Determination of forces in a mine hoisting rope for the point of its overrun on the drum and the point of suspension of the load

Authors:
N. P. Neronov
Date submitted:
1963-09-13
Date accepted:
1963-11-30
Date published:
1964-04-28

Abstract

Forces at the point of the rope running over the drum. To consider the scheme of lifting the load, we introduce the notations: ...

Область исследования:
(Archived) Manufacturing machinery and equipment
Funding:

None

Go to volume 44

Similar articles

Kinematic calculation of some frame systems
1964 L. T. Kandov
Consideration of radiation in problems of flowing of blunt-nosed axisymmetric body by hypersonic gas flow
1964 G. A. Kolton
Review of theoretical studies on determination of dynamic forces in mine hoisting ropes
1964 P. A. Zhuravlev, A. F. Zakharevich
On the work of Prof. M. I. Akimov “On Bessel functions of many variables and their applications in mechanics”
1964 N. P. Neronov
Analysis of the ball mill theory
1964 N. P. Neronov
On the calculation of a cylindrical shell under a linear load distributed along a part of the shell
1964 L. S. Burshtein