Submit an Article
Become a reviewer
Vol 44 Iss. 3
Pages:
21-27
Download volume:
RUS
Article

Determination of forces in a mine hoisting rope for the point of its overrun on the drum and the point of suspension of the load

Authors:
N. P. Neronov
Date submitted:
1963-09-13
Date accepted:
1963-11-30
Date published:
1964-04-28

Abstract

Forces at the point of the rope running over the drum. To consider the scheme of lifting the load, we introduce the notations: ...

Область исследования:
(Archived) Manufacturing machinery and equipment
Go to volume 44

Similar articles

Basic equations of the approximate theory of inertial crushers
1964 Yu. I. Severov
A new method for solving the laminar boundary layer equations
1964 L. A. Kulonen
Review of theoretical studies on determination of dynamic forces in mine hoisting ropes
1964 P. A. Zhuravlev, A. F. Zakharevich
Prof. N. P. Neronov
1964 P. A. Zhuravlev, A. F. Zakharevich
On the calculation of a cylindrical shell under a linear load distributed along a part of the shell
1964 L. S. Burshtein
β-Spectra of RaD
1964 A. A. Bashilov, L. S. Chervinskaya