Estimation of bearing capacity of supporting pillars during in-situ leaching of thick salt deposits (in conditions of Yar-Bishkadak brine field).
Abstract
The Yar-Bishkadak field, which supplies brine to a number of chemical enterprises in Bashkiria, extracts a section of salt deposit with a thickness of 200-700 m, with the thickness of overlying rocks being 400-500 meters. Development is carried out by isolated chambers, which are created by salt leaching through wells drilled from the surface. The adopted technology - stepwise leaching - ensures the creation of chambers of approximately cylindrical shape with a diameter of 80-100 m and height at the end of mining equal to the thickness of the salt deposit (the height of individual chambers currently reaches 100-150 m) ....
Область исследования:
(Archived) Without section
Funding:
None
References
- Levina C. O., Mikhlin S. G. To the question about calculation of stresses in inter-chamber pillars. Tr. Seismolog. in-ta AN SSSR, No. 94, 1940.
- Levina C. O. Additional studies of stresses in inter-chamber pillars. Tr. Seismolog. in-ta AN SSSR, No. 108, 1941.
- Frocht M. Photoelasticity. V. 1. OGIZ, 1948.
Similar articles
Stresses in the massif disturbed by large-diameter wells (photoelastic study)
1966 N. M. Proskuryakov, A. A. Yanishevsky
Influence of large-diameter advanced boreholes on deformations of a coal gently dipping seam
1966 N. M. Proskuryakov
Manifestation of rock pressure in horizontal haulage workings of Tekeli mine and recommendation of rational types of support for them
1966 V. V. Smirnyakov, G. G. Mirzaev