Model study of bearing pressure on abandoned pillars (in the conditions of the Polar mine).
Authors:
Abstract
When developing ore deposits in order to ensure the excavation of the richest part of the deposit in the first place or in case of simultaneous development by underground and open pit methods, it is often necessary to protect the overlying part of the deposit with artificial pillars made of concrete or combined pillars made of ore and concrete. The main purpose of such pillars, which determines the methodology of their calculation, is to ensure the stability of the overlying ore before its mining. A number of studies s are devoted to such calculations ...
Область исследования:
(Archived) Without section
Funding:
None
References
- Galaev N. Z. Distribution of support pressure at different directions of excavation. Zapiski Gornogo Instituta, vol. XLVIII, iss. 1, 1963.
- Gmoshinsky V. G. Rock Pressure on a Gentle Coal Seam in the Neighborhood of Excavation. Ugol', No. 6, 1957.
- Dinnik A. N. et al. Distribution of Stresses around Underground Mine Workings. Tr. soveshchaniya po upravleniyu gornym davleniem. Izd-vo AN SSSR, 1938.
- Melnikov O. M. About the Method of Calculation of Support Pressure. Izv. Vuzov, Gornyi Zhurnal, No. 7, 8, 1964.
- Semevskiy V. N., Panenkov Yu. I., Markovich. Calculation of Concrete Support-Walls for Strength and Stability. Zapiski Gornogo Instituta, vol. XLIX, iss. 1, 1964.
Similar articles
Determination of rock strength limit in mine conditions
1966 Vyach. B. Bokiy, V. P. Melnichenko, A. M. Fridlyand
Peculiarities of roof management depending on fracture orientation and direction of excavation
1966 E. F. Melnikov