Submit an Article
Become a reviewer
Vol 56 Iss. 1
Pages:
102-105
Download volume:
RUS
Article

Probabilistic estimation of reliability of the ground telephone network of a large mining enterprise

Authors:
M. I. Khanukaev
L. M. Sosinsky
Date submitted:
1967-07-28
Date accepted:
1967-09-09
Date published:
1968-06-07

Abstract

In recent years, mining enterprises have been creating computer centers designed to automate the management of complex production processes and quickly process significant amounts of operational and statistical information. The efficiency of the created data processing centers largely depends on the timely receipt of initial information from the control objects (mines). Mines are often dozens and even hundreds of kilometers away from the plants. However, thanks to the use of telecommunication lines for information transfer to the CP, there are new prospects for the use of electronic digital computers. Therefore, the reliability and survivability of communication networks intended for use in data transmission systems become important.

Область исследования:
(Archived) Without section
Go to volume 56

Similar articles

Calculation of the “input - output” characteristic of the mine electric locomotive control scheme with magnetic amplifier
1968 K. A. Ananyev, A. V. Ryseev, I. M. Stolyarov
Frequency converter of roof lowering control
1968 N. V. Semevskaya
Systems for discrete and continuous determinations of phosphate flour moisture content
1968 E. S. Krichevsky, A. F. Avdeeva, I. K. Makarova
Express method of obtaining frequency characteristics of wet materials
1968 E. S. Krichevsky, E. P. Tonkoi
Rapid analysis of P205 content in apatite concentrate by nuclear magnetic resonance method
1968 M. A. Slutskin
Experimental study of the system of automatic maintenance of the set speed of the converting electric locomotive
1968 V. N. Kordakov