Submit an Article
Become a reviewer
Vol 56 Iss. 1
Pages:
102-105
Download volume:
RUS
Article

Probabilistic estimation of reliability of the ground telephone network of a large mining enterprise

Authors:
M. I. Khanukaev
L. M. Sosinsky
Date submitted:
1967-07-28
Date accepted:
1967-09-09
Date published:
1968-06-07

Abstract

In recent years, mining enterprises have been creating computer centers designed to automate the management of complex production processes and quickly process significant amounts of operational and statistical information. The efficiency of the created data processing centers largely depends on the timely receipt of initial information from the control objects (mines). Mines are often dozens and even hundreds of kilometers away from the plants. However, thanks to the use of telecommunication lines for information transfer to the data processing center , there are new prospects for the use of electronic digital computers. Therefore, the reliability and survivability of communication networks intended for use in data transmission systems become of great importance.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 56

Similar articles

Basic parameters of the coal combine with adjustable and non-adjustable drive at destruction of coal of variable strength
1968 S. A. Shteding
Phase-sensitive systems for moisture control of beneficiation products
1968 E. S. Krichevsky
On estimation of probability of single phenomena
1968 L. V. Smirnov
Systems for discrete and continuous determinations of phosphate flour moisture content
1968 E. S. Krichevsky, A. F. Avdeeva, I. K. Makarova
Rapid analysis of P₂O₅ content in apatite concentrate by nuclear magnetic resonance method
1968 M. A. Slutskin
Excavator characteristics of asynchronous electric drive with non-contact parametric regulation
1968 Yu. I. Fel