Submit an Article
Become a reviewer
Vol 56 Iss. 1
Pages:
102-105
Download volume:
RUS
Article

Probabilistic estimation of reliability of the ground telephone network of a large mining enterprise

Authors:
M. I. Khanukaev
L. M. Sosinsky
Date submitted:
1967-07-28
Date accepted:
1967-09-09
Date published:
1968-06-07

Abstract

In recent years, mining enterprises have been creating computer centers designed to automate the management of complex production processes and quickly process significant amounts of operational and statistical information. The efficiency of the created data processing centers largely depends on the timely receipt of initial information from the control objects (mines). Mines are often dozens and even hundreds of kilometers away from the plants. However, thanks to the use of telecommunication lines for information transfer to the CP, there are new prospects for the use of electronic digital computers. Therefore, the reliability and survivability of communication networks intended for use in data transmission systems become important.

Область исследования:
(Archived) Without section
Go to volume 56

Similar articles

Experimental dynamic characteristics of phosphorite concentrate drying process
1968 V. V. Stalsky
System of automatic control of running mechanisms of underground hydraulic monitors
1968 L. P. Severin, B. S. Makhovikov, A. B. Nezametdinov
Simplification of measurements of parameters of quasi-stationary random processes
1968 O. N. Tikhonov, E. A. Troitsky
Rapid analysis of P205 content in apatite concentrate by nuclear magnetic resonance method
1968 M. A. Slutskin
Sensors of movement of the executive body of mining machines
1968 M. D. Kolomiitsov
Express method of obtaining frequency characteristics of wet materials
1968 E. S. Krichevsky, E. P. Tonkoi