Submit an Article
Become a reviewer
Vol 56 Iss. 1
Pages:
102-105
Download volume:
RUS
Article

Probabilistic estimation of reliability of the ground telephone network of a large mining enterprise

Authors:
M. I. Khanukaev
L. M. Sosinsky
Date submitted:
1967-07-28
Date accepted:
1967-09-09
Date published:
1968-06-07

Abstract

In recent years, mining enterprises have been creating computer centers designed to automate the management of complex production processes and quickly process significant amounts of operational and statistical information. The efficiency of the created data processing centers largely depends on the timely receipt of initial information from the control objects (mines). Mines are often dozens and even hundreds of kilometers away from the plants. However, thanks to the use of telecommunication lines for information transfer to the data processing center , there are new prospects for the use of electronic digital computers. Therefore, the reliability and survivability of communication networks intended for use in data transmission systems become of great importance.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 56

Similar articles

Calculation of the “input - output” characteristic of the mine electric locomotive control circuit scheme with magnetic amplifier
1968 K. A. Ananyev, A. V. Ryseev, I. M. Stolyarov
Experimental study of the system of for automatically maintaining enance of the set speed of the converter ing electric locomotive
1968 V. N. Kordakov
Movement sensors of movement of the working member executive body of mining machines
1968 M. D. Kolomiitsov
Obtaining the calibration signal during analytical works on the NMR-spectrometer JNM-3H-60, VN-2
1968 M. A. Slutskin
Phase-sensitive systems for moisture control of beneficiation products
1968 E. S. Krichevsky
Selection of the structure of the automatic control system (ACS) of for the phosphorite concentrate drying process
1968 S. V. Storozhenko