Submit an Article
Become a reviewer
Vol 59 Iss. 1
Pages:
192-195
Download volume:
RUS
Article

On the accuracy of photo scheme compilation in geological photo-documentation of underground mine workings workings

Authors:
E. V. Ponomarev
Date submitted:
1968-07-21
Date accepted:
1968-09-10
Date published:
1969-09-12

Abstract

Visual method of compiling primary geological documentation based on sketches, as is known, has a number of disadvantages, the main of which are subjectivity and relatively low accuracy. The quality and completeness of such documentation depend on the qualification of the performer.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 59

Similar articles

About On fracturing of limestone deposits in the Komi ASSR
1969 S. P. Pavlov
Method of accounting taking into account for the correction for the variability of the sound velocity during sonar at sounding survey of technical wells
1969 V. K. Chumak
Selection of the commutator circuit in a single-vibrator sonar. und locator
1969 I. A. Prudov
On one of the ways of switching from reception to transmission of electroacoustic transducers of sonar devices.
1969 A. E. Taranov
Fluctuations Oscillations of the interface surface of two immiscible liquids in a two-liquid compensator
1969 Yu. I. Bespalov
Calculation of range and optimum frequencies at sonar und location in surveying works
1969 A. A. Gurich, V. M. Merkulova