Dependence of the systematic error of calculation of reserves by ore grades on the density of the exploration network
Abstract
When comparing the data of exploration and exploitation at the sites of Sarbaisky and Sokolovskoye mining pits, it was found that operational exploration on a network of 50x25 m does not clarify the data of detailed exploration, carried out on a network of 100x50 m. At the same time at the sites of both quarries at detailed and operational exploration slightly underestimated ore reserves and iron content in them.
Область исследования:
(Archived) Without section
References
- Bastan P. P., Ivchenko A. N., Medovshchikova N. A. Opportunities of geologic forecasting in the conditions of Sarbaiskoye deposit. Proc. Sverdlovsk, Mining Institute, vol. 46, 1966.
- Lal S. S. About variability of geological and industrial parameters at the Sokolovskoye cagnetite deposit. - In the collection: New Research in Geology. PH LMI, 1969.
- Salimbaev A. S. et al. Comparison of exploration and production data on Sokolovskoye open pit. Proc. of the Academy of Sciences of Kaz. SSR, 1969, No. 1.
Similar articles
Types of vein bodies and the influence of host rocks on their composition
1973 V. Yu. Eshkin, Yu. A. Polenov, G. N. Bogdanov
Spatial and temporal relationship of Devonian bauxites with reefs
1973 N. Ya. Spassky, A. G. Kravtsov
On the reliability of placer exploration by percussion-channel drilling
1973 A. I. Bochkarev, V. P. Pereyaslov
Regularities of cobalt distribution in the main minerals of ores and veins at the Sarbaisky open pit site
1973 N. L. Shamanina, N. I. Rudenko, T. A. Velikoborets