Determination of rock filtration coefficient in the massif at regulated water release from flooded excavations

Authors:
V. B. Bokiy
A. M. Fridlyand
A. I. Gololobov
A. I. Kudryashov
Date submitted:
1973-07-04
Date accepted:
1973-09-04
Date published:
1974-01-01

Abstract

From flooded mine workings the regulated descent of water with a large hydrostatic head can be ensured at reliable determination of the size of the target left between the flooded mine workings and the face of the slipway, through which the water is planned to be discharged. To calculate the size of the pillar it is necessary to know the compressive strength of rocks, which is usually determined by samples at natural moisture.

Область исследования:
(Archived) Without section
Go to volume 64

Similar articles

Mechanics of decoupling and flow of rock outbursts
1974 K. K. Samokhvalov
Dependence of strength of layered material on adhesion and friction at contacts of layers
1974 O. V. Timofeev, R. E. Dashko, N. S. Konokotov
Methods of observation of the effect of mass explosions on the stability of mine workings
1974 G. G. Mirzaev, V. I. Vikharev, V. Ya. Bril
Estimation of structural weakening of rocks
1974 Yu. S. Obruchev, N. S. Konokotov
Photoelastic study of the influence of irregularities in the rock contour of horizontal excavations on the stress state of the contour zone of the rock massif
1974 E. A. Zimina, E. N. Tarasenko
Calculation of metal four-jointed arched compliant support
1974 V. V. Smirnyakov