Determination of the rock filtrationcoefficient in the massif during regulated water release from flooded workings

Authors:
V. B. Bokiy
A. M. Fridlyand
A. I. Gololobov
A. I. Kudryashov
Date submitted:
1973-07-04
Date accepted:
1973-09-04
Date published:
1974-01-01

Abstract

From flooded workings, a regulated release of water with a large hydrostatic head can be ensured by reliably determining the size of the pillar left between the flooded working and the face of the crosscut, along which the water is planned to be discharged. To calculate the size of the pillar, it is necessary to know the compressive strength of rocks, which is usually determined on samples at natural moisture content.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 64

Similar articles

Stability of a ring and a circular arch under symmetrical unevenly non-uniformly distributed loading
1974 Yu. S. Obruchev
The role of the St. Petersburg Mining Institute in the development of coal industry of the Donetsk basin in the pre-revolutionary period
1974 B. V. Bokii
Rational shape of metal support for development workings
1974 V. V. Smirnyakov
Dependence of the strength of layered material on cohesion and friction at layer contacts
1974 O. V. Timofeev, R. E. Dashko, N. S. Konokotov
Estimation of strength of horizontal excavation sides by the condition of detachment of near-contour zones of the rock mass
1974 M. M. Mordukhovich
Approximate analytical determination of the dimensions of the inelastic deformation zone around mine workings
1974 A. G. Protosenya, V. A. Vashilin