Expediency of using high-grade clay powders in drilling wells in the conditions of the North-East and Far North of the USSR.
Abstract
To obtain washing solutions are used clay powders produced by various plants and local lump clays. By the cost of clay material spent on the preparation of 1 m3 of standard solution (with a conditional viscosity of 25 s), as a rule, the wrong conclusion is made about the economic efficiency of local lump clays ...
Область исследования:
(Archived) Without section
Similar articles
Heat-exchange processes during sterile ice core sampling for microbiological studies
1976 B. B. Kudryashov, N. E. Bobin
Marine sampler MP-1 for exploration and prospecting works
1976 I. G. Shelkovnikov, G. I. Morozov, A. V. Lukoshkov
New in the technology of drilling wells at alluvial deposits
1976 I. S. Afanasiev, D. I. Beresneva, V. I. Ryzhov
Peculiarities of drilling and sampling during exploration of phosphorite-bearing deposits of Estonian SSR
1976 G. G. Abels