Improvement of methods of determining the estimated cost - an important factor in increasing the efficiency of geological exploration production
Abstract
The existing methods of preparation of design and estimate documents do not meet the requirements of the planning system of geological exploration, which significantly reduces their effectiveness ...
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Influence of the duration of quarry operation on the level of stock returns
1978 L. E. Kamenetsky, A. P. Litvin
Analysis of bonus indicators and their influence on the level of labor productivity
1978 A. A. Andreev, N. S. Popova, V. I. Smorodinov