Submit an Article
Become a reviewer
Vol 82
Pages:
124-128
Download volume:
RUS
Article

Stress-strain state of pillars during the development of potash deposits with the use of chamber systems

Authors:
O. V. Kovalev
Date submitted:
1979-08-28
Date accepted:
1979-10-24
Date published:
1980-02-01

Abstract

Chamber mining systems with strip pillars are widely used in potash ore mining. Targets are the most important elements that determine both the necessary safety of mining operations and their technology ...

Область исследования:
(Archived) Without section
Go to volume 82

Similar articles

Calculation of the main parameters of the combined method of unstrengthening of hard-to-collapse rocks
1980 V. G. Bezkaravayny, G. I. Morozov
Peculiarities of calculation of stress-strain state of the roof during mining of deposits with hardening filling.
1980 E. D. Kochetkov
Influence of unloading of the edge zone of the formation on the condition of the roof in the bottom-hole space of the faces
1980 V. P. Zubov
Calculation of near-shot pillars
1980 S. A. Tolstunov
Calculation of the minimum width of pillars during combine mining of potash seams
1980 N. M. Proskuryakov, A. K. Chernikov
Determination of bearing capacity of fractured direct roof in the bottom-hole space of mine workings
1980 Ya. B. Entus, G. V. Ovcharenko