Submit an Article
Become a reviewer
Vol 86
Pages:
57
Download volume:
RUS
Article

Purification of flushing fluid from drilled rock

Authors:
A. N. Kholodok
Date submitted:
1980-09-08
Date accepted:
1980-11-05
Date published:
1981-07-09

Abstract

The introduction of the KSSK complex in the Norilsk Integrated Exploration Expedition required the use of non-structural flushing fluids with low solid phase content, since small gaps between the core barrel and drill pipe, as well as between the borehole walls and drill pipes, increase the pressure in the injection line ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 86

References

  1. Gavrilenko N.M., Kostenko N.I. Mode of well washing during drilling of KSSK-76 in sedimentary rocks. - Express-information, ser. Technique and technology of geological exploration works; organization of production. M., PH VIEMS, 1977, № 24.
  2. Instruction on the technology of cleaning of unweighted drilling muds with application of three-stage system RD-39-2-27-77, Krasnodar, VNIIKrneft, 1977.
  3. Povarov A.I. Hydrocyclones at enrichment plants. M., Nedra, 1978.

Similar articles

Предварительные исследования пневмоударного бурения с использованием газожидкостных смесей в качестве очистного агента
1981 V. Ya. Klimov
Conditions of perennially frozen rocks not thawing during casing cementing with warming up
1981 A. M. Yakovlev, A. N. Salamatin
Hydraulic power as a technological parameter of diamond drilling
1981 L. K. Gorshkov
Analysis of heat exchange processes during ice drilling-melting by steam condenser
1981 B. B. Kudryashov, G. N. Soloviev
Application of hydrophobic emulsion for drilling through mudstones of the Exploration Formation of the Norilsk Region
1981 A. N. Kholodok, V. Ya. Klimov
Wellbore stability when drilling in ice deposits
1981 V. M. Pashkevich