Development of a two-species structure of the repair cycle of the equipment of mica mines

Authors:
E. L. Korotkikh
L. V. Shevelev
A. V. Antia
Date submitted:
1980-10-02
Date accepted:
1980-12-30
Date published:
1981-07-09

Abstract

The analysis of the organization of repair work at mica mines shows that preventive maintenance of technological, lifting and transport, electrical, heat and power and other equipment is carried out both by two- and three-species structure, using in the cycle of average repair ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 87

References

  1. Borisov Yu.S. Organization of repair and maintenance of equipment. M., Mashinostroenie, 1978.
  2. Instruction on the planned preventive repair of construction machines No. SN 207-68. M., PH of Literature on Construction, 1969.
  3. Regulations on planned preventive repair and operation of equipment of enterprises of building materials industry. M., Stroyizdat, 1970. Iss. 11. Industry of non-metallic materials.

Similar articles

Application of mathematical methods at planning of preventive maintenance of mining machines
1981 A. I. Talko, O. A. Kaznacheev
Friction drive of the cross feed of the stone-cutting machine
1981 Yu. S. Fedorov, E. M. Ulyanov, G. V. Sokolova
Processing of oscillograms of KSh-1KG shearers loading
1981 E. V. Anikin, M. D. Kolomiytsov
Unsteady flow in the hydraulic drive system at braking of a piston with inertial load
1981 K. G. Asatur, G. M. Egorov, S. G. Zaritsky, A. S. Smorodin
Parameters of bar stone cutting machine
1981 N. K. Ulashik, S. V. Shipulin
Improvement of systems of preventive maintenance of equipment
1981 E. L. Korotkikh