Submit an Article
Become a reviewer
Vol 87
Pages:
24-26
Download volume:
RUS
Article

Complex work on quality assessment of overhaul repair of mining combines in Kuzbass

Authors:
V. Yu. Nenarokomov
Date submitted:
1980-10-05
Date accepted:
1980-12-01
Date published:
1981-07-09

Abstract

Cleaning (KSH-1KG, KSH-ZM) and tunneling (PK-ZR, 4PU, PK) combines used in the production associations Kuzbassugol and Leninskugol are undergoing overhaul at the ore repair plant Krasny Oktyabr (Leninsk-Kuznetskiy) ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 87

Similar articles

Determination of design durability of machine parts
1981 E. S. Kuznetsov
Similarity of flotation machines at their modeling
1981 V. V. Denegin
Bench post-repair tests of mining narrow-capture combines
1981 A. G. Andreev
Application of mathematical methods at planning of preventive maintenance of mining machines
1981 A. I. Talko, O. A. Kaznacheev
Unsteady flow in the hydraulic drive system at braking of a piston with inertial load
1981 K. G. Asatur, G. M. Egorov, S. G. Zaritsky, A. S. Smorodin
Analysis of the system of collecting information about the reliability of mining machines
1981 D. A. Jungmeister, I. I. Margolin