Submit an Article
Become a reviewer
Vol 88
Pages:
120
Download volume:
RUS
Article

Determination of mining equipment reserve value

Authors:
B. S. Borsch
Date submitted:
1980-11-18
Date accepted:
1981-01-13
Date published:
1981-05-28

Abstract

One of the ways to ensure the fulfillment of the planned task by the mining enterprise is general redundancy, in which there is some unloaded reserve of machines, replenishing the fleet of operating ones when they fail before the scheduled repair ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 88

Similar articles

Methodology of determining the design parameters of the surface of the driving vacuum drums of belt conveyors
1981 K. A. Vasiliev, B. P. Zhuravlev
Calculation methodology of culvert devices in the hydraulic transportation system
1981 Yu. N. Gulyaev, A. S. Medvedev
Methodology of prediction of pulp conveyor wear
1981 V. N. Pokrovskaya, L. G. Gambaryan, E. V. Sergeev
Investigation of axial loads of ground pumps in schemes with sequential inclusion
1981 D. G. Povolotsky
Influence of surface-active substances on energy characteristics of hydraulic transportation
1981 E. V. Sergeev
Classification of systems of quarry motor transport and mathematical model of their optimization
1981 A. A. Kuleshov