Submit an Article
Become a reviewer
Vol 93
Pages:
35
Download volume:
RUS
Article

Estimation of efficiency of the method of accelerated well plugging

Authors:
N. I. Nikolaev
L. A. Tereshchenko
L. K. Gorshkov
A. M. Yakovlev
Date submitted:
1981-09-06
Date accepted:
1981-11-20
Date published:
1982-10-29

Abstract

At geological exploration drilling for elimination of all kinds of complications is spent up to 25% of the calendar time of work of drilling rigs, and drilling productivity in some cases is halved ...

Область исследования:
(Archived) Without section
Go to volume 93

References

  1. Lipatov N.K., Patrushev G.V. Device for isolation of zones of wash fluid absorption and water influxes in wells. A.s. № 451835 (USSR). Published in B.I., 1975, No. 44.
  2. Nikolaev N.I., Tereshchenko L.A., Yakovlev A.M. et al. Device for liquidation of complications in a well. A.c. № 685808 (USSR). Published in B.I., 1979, № 34.
  3. Rudenko A.P. Tamponization and patching of wells in diamond drilling. L., Nedra, 1978.

Similar articles

On correlation of well wall stability with carbonateness of clayey rocks
1982 D. I. Bereseneva, Yu. M. Chaschinov, L. A. Kuzmenko
Regularities of the process of deep type well drilling in ice
1982 B. B. Kudryashov, A. M. Shkurko
About development of special drilling muds for drilling Antarctic ice sheets
1982 V. M. Pashkevich, V. K. Chistyakov
Fundamentals of the theory and calculation of pressure during foam movement in a borehole
1982 B. B. Kudryashov, Yu. D. Muraev, V. Ya. Klimov
Calculation methodology of drill pipe threaded joints in exploration drilling
1982 I. G. Shelkovnikov
Efficiency of foam application in drilling for solid minerals
1982 A. M. Yakovlev, V. I. Kovalenko, A. V. Golovkin