Estimation of efficiency of the method of accelerated well plugging
Abstract
At geological exploration drilling for elimination of all kinds of complications is spent up to 25% of the calendar time of work of drilling rigs, and drilling productivity in some cases is halved ...
Область исследования:
(Archived) Without section
References
- Lipatov N.K., Patrushev G.V. Device for isolation of zones of wash fluid absorption and water influxes in wells. A.s. № 451835 (USSR). Published in B.I., 1975, No. 44.
- Nikolaev N.I., Tereshchenko L.A., Yakovlev A.M. et al. Device for liquidation of complications in a well. A.c. № 685808 (USSR). Published in B.I., 1979, № 34.
- Rudenko A.P. Tamponization and patching of wells in diamond drilling. L., Nedra, 1978.
Similar articles
Study of RP-111 pneumatic percussion hammer operation on gas-liquid mixtures with surfactant additives
1982 V. Ya. Klimov, I. I. Nikolaev, I. V. Kulikov, V. P. Pevzner
About development of special drilling muds for drilling Antarctic ice sheets
1982 V. M. Pashkevich, V. K. Chistyakov