Design schemes of working bodies of machines for non-explosive destruction of oversized rocks
Abstract
One of the urgent problems affecting the efficiency of mining production is the preparation of rock mass for loading. This problem includes not only works on crushing of rocks by mass blasting, but also destruction of oversized pieces.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Experience in the use of non-stroked water-containing explosives in industrial conditions
1984 A. N. Khanukaev, V. S. Kulikov, A. N. Karasev, A. N. Monakhov
Dependence of the intensity of the shock air wave on the length and material of the bottom hole
1984 V. A. Borovikov, I. F. Vanyagin, V. A. Artemov, V. K. Khurtsidze
Theoretical evaluation of teeth sliding influence on rock drilling efficiency by roller cone bits
1984 G. M. Kryukov, Ny Van Buck
Increase of efficiency of drilling machines utilization during drilling of small-diameter boreholes at mica mines
1984 K. P. Khmyznikov