Conducting drilling and blasting works in cramped conditions

Authors:
V. P. Tarasenko
V. I. Sivenkov
V. V. Pupkov
Date submitted:
1983-07-13
Date accepted:
1983-09-20
Date published:
1984-12-06

Abstract

To conduct the most labor-intensive mining work in the construction of excavations, trenches, site planning is the most widely used drilling and blasting method. However, the use of blasting is often hampered by cramped conditions, when in the immediate vicinity are buildings, structures and other objects.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 99

Similar articles

Experiments on rock plate fracture by impact and explosion
1984 V. A. Bezmaternykh, A. S. Shchukin, S. M. Petukhov
Peculiarities of detonation of aluminous water-containing explosives
1984 S. A. Petrov, B. G. Kirs
Parameter of impact of elongated shaped charges on rocks
1984 V. N. Kovalevsky, M. A. Nefedov, A. N. Murakhin, V. N. Pylinin
Estimation of efficiency of rock block jackhammering taking into account interblock fracturing
1984 A. V. Zditovetsky, G. S. Lursmanashvili
Thermal methods of fracture in modern conditions
1984 L. S. Derbenev
Definition of optimum degree of crushing granite massif by explosion on crushed stone quarries
1984 V. P. Makaryev, V. A. Mikhailov