Submit an Article
Become a reviewer
Vol 102
Pages:
62-64
Download volume:
RUS
Article

Prospective planning of coal production cost on the basis of herringbone cost model

Authors:
G. A. Golovanov
V. A. Zinkevich
Date submitted:
1983-10-24
Date accepted:
1983-12-03
Date published:
1984-12-13

Abstract

The cost of production is a synthetic generalizing indicator that characterizes the efficiency and quality of work at each level of management. The purpose of planning the cost of production is, as it is known, to determine the necessary technical and economic justified costs of production and realization of the planned volume, assortment and quality.

Область исследования:
(Archived) Without section
Go to volume 102

Similar articles

Extensive use of excavators at coal mines
1984 G. A. Vashkinel, V. I. Zaichenko
Criteria of optimal management of technological process at quarries
1984 Yu. A. Timofeev
Information system of universal purpose with natural language for solving the problems of mineral resources management
1984 A. N. Livshits, M. A. Borisova, V. N. Smirnov, A. E. Falk
Solution Analysis of the Experimental Problem of On-Board Content Optimization
1984 E. V. Morozova
Improvement of the mechanism of management of the mineral and raw materials complex on the basis of the system of mineral cadastres
1984 Yu. M. Arsky
To the issue of improving the preparation of design and estimate documentation
1984 A. V. Golovkin, L. I. Iseeva, L. N. Zueva