Submit an Article
Become a reviewer
Vol 105
Pages:
59-64
Download volume:
RUS
Article

Investigation of technological parameters of well plugging process

Authors:
N. I. Nikolaev
V. I. Kovalenko
Date submitted:
1984-09-10
Date accepted:
1984-11-17
Date published:
1985-11-27

Abstract

Application of so-called "dry" quick-setting mixtures (DSM) based on mineral binders as plugging material for isolation of zones of geological complications (cleaning agent absorption, water influxes and intervals of unstable rocks associated with them) required creation of a number of special devices for delivery and processing of DSM directly in the well interval to be plugged.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 105

References

  1. Aitmatov I.T., Kravtsov B.I., Polovov B.D. Tamponization of watered rocks in mine construction. M., Nedra, 1972.
  2. Lomakin A.A. Centrifugal and axial pumps. M., Mashinostroenie, 1966.
  3. Timoshenko S.P. Resistance of Materials. M., Nauka, 1965. V. 2.

Similar articles

Some issues of high speed diamond drilling
1985 G. A. Blinov, V. I. Vasiliev
Experimental studies of resistances during the movement of removable tools in drill pipes
1985 V. P. Onishchin, N. I. Kornilov, V. V. Yakovenko
Formation of the average value of the mechanical speed of diamond drilling
1985 A. V. Sakharov
Justification of the experimental research methodology of the electrothermal drilling method
1985 Vladimir S. Litvinenko, V. K. Chistyakov, G. S. Brodov
Gas-volume express method of carbonativity determination in argillites
1985 I. V. Godun, A. N. Kholodok
Improvement of tying schemes for drilling with core transporting hydraulics
1985 V. A. Blinov