Submit an Article
Become a reviewer
Vol 105
Pages:
59-64
Download volume:
RUS
Article

Investigation of technological parameters of well plugging process

Authors:
N. I. Nikolaev
V. I. Kovalenko
Date submitted:
1984-09-10
Date accepted:
1984-11-17
Date published:
1985-11-27

Abstract

Application of so-called "dry" quick-setting mixtures (DSM) based on mineral binders as plugging material for isolation of zones of geological complications (cleaning agent absorption, water influxes and intervals of unstable rocks associated with them) required creation of a number of special devices for delivery and processing of DSM directly in the well interval to be plugged.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 105

References

  1. Aitmatov I.T., Kravtsov B.I., Polovov B.D. Tamponization of watered rocks in mine construction. M., Nedra, 1972.
  2. Lomakin A.A. Centrifugal and axial pumps. M., Mashinostroenie, 1966.
  3. Timoshenko S.P. Resistance of Materials. M., Nauka, 1965. V. 2.

Similar articles

Experimental studies of resistances during the movement of removable tools in drill pipes
1985 V. P. Onishchin, N. I. Kornilov, V. V. Yakovenko
Some issues of high speed diamond drilling
1985 G. A. Blinov, V. I. Vasiliev
Study of physical and chemical properties of plugging systems based on their electrical conductivity
1985 S. N. Afanasyev, L. A. Tereshenko, I. L. Eberling
Change of permeability of reservoirs in downhole zones of hydrogeological wells during drilling by different methods
1985 V. A. Berezhnoy, V. V. Antonov, Yu. M. Pariysky
About dependence of wellbore stability on the degree of ignimbrite argyllization on the example of one field of the North-East.
1985 V. G. Portnov, D. I. Beresneva, V. P. Gnedina, Yu. M. Chashinov
Formation of the average value of the mechanical speed of diamond drilling
1985 A. V. Sakharov