Submit an Article
Become a reviewer
Vol 105
Pages:
59-64
Download volume:
RUS
Article

Investigation of technological parameters of well plugging process

Authors:
N. I. Nikolaev
V. I. Kovalenko
Date submitted:
1984-09-10
Date accepted:
1984-11-17
Date published:
1985-11-27

Abstract

Application of so-called "dry" quick-setting mixtures (DSM) based on mineral binders as plugging material for isolation of zones of geological complications (cleaning agent absorption, water influxes and intervals of unstable rocks associated with them) required creation of a number of special devices for delivery and processing of DSM directly in the well interval to be plugged.

Область исследования:
(Archived) Without section
Go to volume 105

References

  1. Aitmatov I.T., Kravtsov B.I., Polovov B.D. Tamponization of watered rocks in mine construction. M., Nedra, 1972.
  2. Lomakin A.A. Centrifugal and axial pumps. M., Mashinostroenie, 1966.
  3. Timoshenko S.P. Resistance of Materials. M., Nauka, 1965. V. 2.

Similar articles

Change of permeability of reservoirs in downhole zones of hydrogeological wells during drilling by different methods
1985 V. A. Berezhnoy, V. V. Antonov, Yu. M. Pariysky
Calculation of the working process of a compressor with a liquid piston for gas-liquid systems
1985 V. G. Vartykyan, N. S. Vulisanov, A. I. Kirsanov, N. I. Slyusarev, O. Yu. Ustyushenkova
Pressure in the foam flow at water penetrations in a borehol
1985 A. M. Yakovlev, A. F. Kryuchkov
Gas-volume express method of carbonativity determination in argillites
1985 I. V. Godun, A. N. Kholodok
Improvement of tying schemes for drilling with core transporting hydraulics
1985 V. A. Blinov
Some issues of high speed diamond drilling
1985 G. A. Blinov, V. I. Vasiliev