Reduction of the number of pumping pumping stations on the main slurry pipelines

Authors:
A. B. Nezametdinov
Date submitted:
1986-07-17
Date accepted:
1986-09-23
Date published:
1987-06-19

Abstract

At operation - systems of main coal hydrotransportation systems reliability can be increased, if to simplify the structure of systems, for example, to apply such a facet composition of a hydraulic mixture, that in system the dewatering complex is not necessary.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 110

Similar articles

Influence of laterite hydrotransport parameters on the precipitation process
1987 R. I. Pupo
Pipeline vibrations under impulse loading
1987 P. G. Isaev, V. A. Romanov, A. K. Nikolaev
Experimental estimation of load weighing error in a moving dump truck
1987 V. A. Gardzish, M. A. Semenov
Unit for construction of large-span underground excavations
1987 V. G. Ivanov
Investigation of mechanical schemes of dump trucks with carrying capacity more than 100 tons
1987 I. V. Zyryanov
Mechanized sludge removal along the path of belt conveyors of long length
1987 Yu. D. Tarasov