Unit for construction of large-span underground excavations

Authors:
V. G. Ivanov
Date submitted:
1986-07-20
Date accepted:
1986-09-16
Date published:
1987-06-19

Abstract

The AMKI unit was created in Leningrad for the construction of single-wall subway stations. The unit is a transportation and tunneling complex, in which the transportation devices are its main structural element.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 110

Similar articles

To the issue of efficiency of braking systems of dump trucks of especially large load-carrying capacity
1987 M. S. Semakin
Experience of operation of heavy-duty dump trucks at laterite quarries of Cuba
1987 O. Kintana
Influence of laterite hydrotransport parameters on the precipitation process
1987 R. I. Pupo
Transportation of hardening embedded mixtures by polyethylene pipes
1987 L. G. Gambaryan
Mechanized sludge removal along the path of belt conveyors of long length
1987 Yu. D. Tarasov
Algorithm of reliability assessment of the hydrotransport system with unloaded reserve and recovery
1987 D. G. Povolotsky, O. E. Nivorozhkin