Unit for construction of large-span underground excavations
Authors:
Abstract
The AMKI unit was created in Leningrad for the construction of single-wall subway stations. The unit is a transportation and tunneling complex, in which the transportation devices are its main structural element.
Область исследования:
(Archived) Without section
Funding:
None
Similar articles
Experimental estimation of load weighing error in a moving dump truck
1987 V. A. Gardzish, M. A. Semenov
Distribution of load between drives of a multi-drive belt conveyor
1987 I. I. Margolin, K. A. Vasiliev
Algorithm of reliability assessment of the hydrotransport system with unloaded reserve and recovery
1987 D. G. Povolotsky, O. E. Nivorozhkin
Rational level of reliability of transportation systems of quarries
1987 A. A. Kuleshov, S. N. Reznikov