Unit for construction of large-span underground excavations

Authors:
V. G. Ivanov
Date submitted:
1986-07-20
Date accepted:
1986-09-16
Date published:
1987-06-19

Abstract

The AMKI unit was created in Leningrad for the construction of single-wall subway stations. The unit is a transportation and tunneling complex, in which the transportation devices are its main structural element.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 110

Similar articles

Operating life of peristaltic pump and indicators of its reliability
1987 V. I. Alexandrov
Determination of the final velocity of serpentinite ore grains from the Punta Gorda deposit falling in water
1987 M. Suarez, V. Labrador
Features of calculation of thermal modes of traction belts of intermediate vacuum drives with sliding supports
1987 D. A. Jungmeister
Ways to increase reliability of operation of the linear part of hydraulic transportation systems
1987 A. N. Frakman
Ways to increase the lifting capacity of mine hoisting plants with friction pulley
1987 S. S. Naumov
Algorithm of reliability assessment of the hydrotransport system with unloaded reserve and recovery
1987 D. G. Povolotsky, O. E. Nivorozhkin