Unit for construction of large-span underground excavations

Authors:
V. G. Ivanov
Date submitted:
1986-07-20
Date accepted:
1986-09-16
Date published:
1987-06-19

Abstract

The AMKI unit was created in Leningrad for the construction of single-wall subway stations. The unit is a transportation and tunneling complex, in which the transportation devices are its main structural element.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 110

Similar articles

Thickening of fine slurries by plate thickener in industrial conditions
1987 V. P. Dokukin, S. A. Makarov
Determination of operation level and condition of tailing ponds by the method of expert evaluations
1987 G. A. Railyan
Features of calculation of thermal modes of traction belts of intermediate vacuum drives with sliding supports
1987 D. A. Jungmeister
Transportation of hardening embedded mixtures by polyethylene pipes
1987 L. G. Gambaryan
To the issue of efficiency of braking systems of dump trucks of especially large load-carrying capacity
1987 M. S. Semakin
Stability of the effect of reduction of integral parameters at hydraulic transportation of bulk materials
1987 E. V. Sergeev